Page "Coal mining" Paragraph 22
from
Wikipedia
When the operation reaches a predetermined stripping ratio ( tons of overburden / tons of coal ), it is not profitable to continue.
Depending on the equipment available, it may not be technically feasible to exceed a certain height of highwall.
At this point, it is possible to produce more coal with the augering method in which spiral drills bore tunnels into a highwall laterally from the bench to extract coal without removing the overburden.
Page 1 of 1.
1.806 seconds.