According to the FHWA, I-275 ends at the junction with I-96 and M-14 along the boundary between Livonia and Plymouth Township.
MDOT considers I-275 to extend north concurrently with I-96 to the junction with I-696 and M-5 along the boundary between Farmington Hills and Novi.
Maps from other providers follow MDOT's lead and label the freeway north of M-14 as I-96 / I-275.
The southern terminus is the interchange with I-75 near Newport, northeast of Monroe.
The original planned section north to I-75 near Davisburg was abandoned because of local opposition shortly after the existing highway was completed in 1977.
A later attempt to revive the proposal failed in 1979.
Additional plans to complete a state highway, known as M-275 through Oakland County were kept on the drawing boards through the 1980s, but failed to materialize.