Page "Itaipu Dam" Paragraph 13
from
Wikipedia
However, because the head ( difference between reservoir level and the river level at the foot of the dam ) that actually occurs is higher than the designed head ( 118 m ), the power available exceeds 750 MW half of the time for each generator.
Page 1 of 1.
2.363 seconds.