Page "PATCO Speedline" Paragraph 33
from
Wikipedia
The entire PATCO system is run from Center Tower, centrally located above a substation near the Broadway station in Camden, NJ.
The CTC machine at Center Tower is staffed by two operators at peak periods and a single operator otherwise.
Wayside signals are marked with their corresponding lever in the old US & S fashion with R signals indicating a " right " lever motion and L signals indicating " left ".
Signals and switches are numbered in ascending order from west to east with 15th / 16th Locust using levers 1-4 and Lindenwold using levers 73-76.
Page 1 of 1.
2.565 seconds.