Help


from Wikipedia
« »  
The entire PATCO system is run from Center Tower, centrally located above a substation near the Broadway station in Camden, NJ.
Center Tower contains a relay based CTC machine dating from 1968.
The CTC machine at Center Tower is staffed by two operators at peak periods and a single operator otherwise.
Wayside signals are marked with their corresponding lever in the old US & S fashion with R signals indicating a " right " lever motion and L signals indicating " left ".
Signals and switches are numbered in ascending order from west to east with 15th / 16th Locust using levers 1-4 and Lindenwold using levers 73-76.
The interlocking at Woodcrest, which was added in 1980, uses levers 87-98.

2.565 seconds.