Page "Pontcysyllte Aqueduct" Paragraph 8
from
Wikipedia
Every five years the ends of the aqueduct are closed and a plug in one of the highest spans is opened to drain the canal water into the River Dee below, for inspection and maintenance of the trough.
Page 1 of 1.
2.003 seconds.