As part of a comprehensive assessment of flood risks caused by the River Don and its tributaries, the River Dearne Improvement Scheme was implemented between 1963 and 1973.
It was recognised that simple enlargement of the river channel would not provide a satisfactory solution, as it would just move the problem to the River Don, and therefore a series of washlands were created, which could be progressively flooded if required, without affecting centres of population.
Near the mouth of the river, Dearne Mouth washland, which is now known as the Denaby Ings Nature Reserve, was created in 1963, and a manually operated sluice allowed the flow of the river to be diverted through the floodbank and into the washland when there were high levels at the junction with the River Don.
The sluice was rebuilt in 1973.
Additional washlands were created at Harlington and North Ings, and the river was straightened and realigned.