Help


from Wikipedia
« »  
A detailed study into SSTO vehicles was prepared by Chrysler Corporation's Space Division in 1970 – 1971 under NASA contract NAS8-26341.
Their proposal ( Shuttle SERV ) was an enormous vehicle with more than 50, 000 kg of payload, utilizing jet engines for ( vertical ) landing.
While the technical problems seemed to be solvable, the USAF required a winged design ( for cross range ) that led to the Shuttle as we know it today.

1.811 seconds.