Help


from Wikipedia
« »  
Construction began in 1961, and Studentenstadt was built in four stages.
In the first stage, between 1961 and 1963, Houses 1-6 were built.
In the second, between 1966 and 1968, Houses 7 and 8 were built.
In the third, between 1971 and 1973, Houses 9 and 10 were built.
Finally, in the final stage, the last four houses were built between 1974 and 1975.
A few of these houses are named, mostly after those who supported construction.
In 1975, a children's nursery was opened, and the Hans-Scholl-Halle was built between 1976 and 1977.
The U-Bahn stop at Studentenstadt was opened on October 19, 1971, just as 8 of the 14 houses were completed.

2.456 seconds.