Help


from Brown Corpus
« »  
After trimming off the excess on the frames and transom which was used to fasten them to the jig at a working height, the top of the side planking is installed.
This is made up of scraps left over from the sides and bottom.
These flaring parts really help to keep the boat dry.
When they're on, the top edges are planed even with the sheer batten.

1.875 seconds.