Help


from Brown Corpus
« »  
This operation was started at 5:00 p.m. and lasted for 29 minutes.
There was a slight lapse condition, a moderate fog, and 100 per cent relative humidity.
A network of sampling stations had been set up on shore.
These were located at the homes of Government employees, in Government Offices, buildings and reservations within the trial area.
A rough attempt was made to characterize the vertical profile of the cloud by taking samples from outside the windows on the first, ninth, and fifteenth floors of a Government office building.

2.258 seconds.