Being the first tubular bridge to be built, the design needed much testing on prototypes to confirm that it would be capable of carrying heavy locomotives, the testing being performed by Fairbairn.
Being the first tubular bridge to be built, the design needed much testing on prototypes to confirm that it would be capable of carrying heavy locomotives, the testing being performed by Fairbairn.
0.010 seconds.