By 1950, after the virtual completion of the by then much watered-out " level of industry " plans, equipment had been removed from 706 manufacturing plants in western Germany and steel production capacity had been reduced by 6, 700, 000 tons.
By 1950, after the virtual completion of the by-then much watered-down " level of industry " plans, equipment had been removed from 706 manufacturing plants in the west, and steel production capacity had been reduced by 6. 7 million tons.
By 1950, after the virtual completion of the by then much watered-down " level of industry " plans, equipment had been removed from 706 manufacturing plants in the west and steel production capacity had been reduced by 6, 700, 000 tons.
0.010 seconds.