Help


[permalink] [id link]
+
Page "Malpasset" ¶ 2
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Construction and cost
Final construction and the addition of the Kariba North Power cavern by Mitchell Construction was not completed until 1977 due to largely political problems for a total cost of $ 480, 000, 000.
Construction started in 1840 and lasted for thirty years, suffering great delays and cost overruns, as well as the death of both leading architects ; works for the interior decoration continued intermittently well into the twentieth century.
By 1989 there were signs of a revival of the overseas construction market — the Dong Ah Construction Company signed a US $ 5. 3 billion contract with Libya for the second phase of Libya's Great Man-Made River Project, which, when all five phases were completed, was projected to cost US $ 27 billion.
Construction delays and added features by Congress added greatly to the cost.
Construction began in 1914 under the leadership of Charles Sumner Frost and took two years, at a total cost of $ 4. 5 million.
Construction was started in 1973 and completed in 1979 at a cost of $ 139 Million.
Construction accounted for roughly 90 per cent of the Manhattan Project's total cost.
Construction took five years and cost £ 32 million.
On December 14, 2007 Duke Power submitted a Combined Construction and Operating License to the Nuclear Regulatory Commission, with an announcement that it will spend $ 160 million in 2008 on the plant with a total cost of 5-6 billion dollars.
Construction was completed in 1882 at a cost of about $ 79, 000.
In 2004 a new Campus Center was opened, designed by the Boston-based architectural firm of Kallmann McKinnell & Wood and built by Suffolk Construction at a cost of $ 80 million.
Construction took place in 1981 and cost $ 200, 000.
Construction on the first parish courthouse in Sabine was completed in 1880, at a cost of $ 11, 000.
Construction of the original light was completed in December 1794 at a final cost of $ 11, 359. 14.
Construction of the initial phase was finished in 1770, at a total cost of around £ 75, 000.
Construction started in 1818 and the canal was finished in 1823, at a cost of £ 170, 000.
Construction of Terminal 3 began in 2004 as next stage of phase 2 of the development, with an estimated cost of around $ 4. 55 billion.
Construction began in the fall of 2006 and cost an estimated $ 75 million to complete.
Construction started in 2004 and was suspended due to projected cost increases in 2009, but resumed in 2010.
Construction on the access road was completed in 1943 at a cost of over $ 2 million.
Construction on this interchange, which cost $ 31 million, began in April 2009.
Construction has started on the secondary treatment level plant with the governments of Canada and Ontario each covering one-third of an estimated $ 55. 5 million construction cost.
Construction of the White City Stadium, which cost the government about £ 60, 000, was not counted.
Construction began in 1887 ; it took six years and cost about £ 15 million ( equivalent to about £ 1. 65 billion as of 2011 ).
Construction of the library ran into huge cost overruns and technical difficulties related to its high-rise design, so much so that it was referred to as the " TGB " or " Très Grande Bibliothèque " ( i. e. " Very Large Library ," a sarcastic allusion to France's successful high-speed rail system, the TGV ).

Construction and million
Construction was halted in August 2008, as Gillett and Hicks had difficulty in financing the £ 300 million needed for the development.
Construction costs totaled approximately US $ 150 million at the time, which would be equivalent to roughly US $ 950 million in 2005.
The $ 44 million Sunshine Construction Futures building is now being built for building and construction training.
Construction is budgeted at $ 200 million, of which $ 50 million has been allocated from the State Oil Fund of Azerbaijan ( SOFAZ ).
Construction lasted 15 years, and required more than a million workers.
Construction of the new 22 million dollar Seacoast Inn, a 78-room, four-story, upscale Mediterranean-style resort with restaurant, spa and conference facilities, is underway on the 1. 4 acre oceanfront lot and due to be complete by October 2012.
Scheduled for completion in fall 2013, the $ 93 million courthouse — which is being built by Sundt Construction Inc. and designed by CO Architects — will provide the necessary space for expansion and enhanced security, enabling the court to greatly improve access and services.
** Construction began on the $ 16 million, Nicholasville bypass in March 1986.
Other hurricanes, such as Diana in 1984, Bertha and Fran in 1996 and Floyd in 1999, have caused damage to the island, though nowhere near as catastrophic as that of Hazel. Construction began on a $ 64 million bridge project in November 2007, with a December 2009 completion date.
Construction was halted by developer Jim Petrucci when the team owner, Thomas Flaherty, filed for Chapter 11 bankruptcy on February 1, 2000, with some $ 3 million in debts.
Construction of the Satsop Nuclear Power Plant began in 1977 and was halted in 1983 after a $ 961 million budget shortfall, leaving the plant 76 % complete.
In May 2012, Volvo Construction Equipment began a $ 100 million expansion project to bring its American headquarters to Shippensburg.
Construction of the telescopes was made possible through private grants totaling more than $ 140 million provided by the W. M. Keck Foundation.
The current incarnation of Route 129 was constructed along a former portion of the Delaware and Raritan Canal as an alternate arterial boulevard to Route 29 that opened in September 1993 from Lamberton Road to U. S. Route 1 at a cost of $ 24. 185 million ( 1993 USD ) by the George Harms Construction Company.

Construction and francs
Construction costs, estimated at 7 million French francs and drawn entirely from private donations, were expended before any above-ground visible structure was to be seen.
Construction costs were estimated at 40-50 million Swiss francs, with annual operating costs of 2. 5 million francs.

0.797 seconds.