Help


[permalink] [id link]
+
Page "New York Tunnel Extension" ¶ 9
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

PRR and ultimately
Although the PRR ultimately decided to build tunnels under the river rather than a bridge, the two companies continued their relationship.

PRR and decided
The next area to be electrified was the Philadelphia terminal area, where PRR officials decided to use overhead lines to supply power to the suburban trains running out of Broad Street Station.
In 1833, based on William Hasell Wilson's survey, the state-owned Philadelphia and Columbia Railroad, the predecessor of the Pennsylvania Railroad ( PRR ), decided to locate its terminus within the limits of the City of Philadelphia, at Broad and Callowhill Streets.

PRR and single-track
The single-track lines of the NKP and PRR were jointly operated to form a double-track line which was used by the trains of both railroads.

PRR and tunnels
This second set of tunnels linked the new station to Queens and the Long Island Rail Road, which came under PRR control ( see East River Tunnels ), and Sunnyside Yard in Queens, where trains would be maintained and assembled.
First was the New York terminal area, where tunnels precluded steam locomotives ; a direct current ( DC ) 650-volt third rail powered PRR locomotives ( and LIRR passenger cars ).
His purchase of a controlling interest in the Long Island Rail Road and the construction of tunnels under the East River created a PRR commuter network on Long Island.
They included construction of new tunnels between Jersey City and Manhattan, and possibly a tunnel to Brooklyn ; new terminals in mid-town Manhattan for both the PRR and LIRR, completion of the Hudson Tubes, and a bridge proposal.
The Meadows Division project built a new route from the PRR main line at Harrison, New Jersey, northeast to the west end of the new tunnels.

PRR and under
In 1966, New York State bought the railroad's controlling stock from the PRR and put it under the newly formed Metropolitan Commuter Transportation Authority ( renamed Metropolitan Transportation Authority in 1968 ).
On December 12, 1901 PRR president Alexander Cassatt announced the railroad's plan to enter New York City by tunneling under the Hudson and building a grand station on the West Side of Manhattan south of 34th Street.
Following Loomis ' death in 1937, the presidency went to Loomis ' assistant Duncan J. Kerr, but in 1940 he was replaced by Albert N. Williams, and the road came under the influence of the PRR.
The B & B was under complete control of the PRR from 1872 onwards but was separated from the contiguous PRR system until 1910, when they completed their Bedford Division between Cessna and Brookes Mills.
The K4s was designed under the supervision of PRR Chief of Motive Power J. T.
On July 1, 1915 the Monongahela Railroad consolidated with the Buckhannon and Northern Railway to form the Monongahela Railway Company ( MRY ), still under the control of the parent companies ( PRR and P & LE ).
The North River Tunnels carried PRR trains under the Hudson ; for some years PRR electric engines also pulled Lehigh Valley Railroad or Baltimore and Ohio Railroad trains to New York.
PRR operated under court supervision until 1976, when the Northeast Corridor rail line was transferred to Amtrak for use in passenger service, and the remaining lines were transferred to a new government corporation, Conrail.
It was only later revealed that at the time, both the C & O and the N & W were essentially under the common control of the even larger Pennsylvania Railroad ( PRR ) and New York Central Railroad ( NYC ), whose leaders, Alexander Cassatt and William Vanderbilt respectively, had secretly entered into a " community of interests " pact.
Both lines eventually came under Conrail ownership in 1976, with the former PRR line being abandoned and now used as a hike / bike path.
It was constructed in 1918 when the branch was part of the Pennsylvania Railroad ( PRR ) under the direction of architect-engineer Alexander C. Shand, who had also overseen construction of the now demolished Philadelphia Broad Street Station.
The City of Philadelphia and suburban counties began providing public funds under contract with PRR and RDG for continuation and improvement of regional rail service.

PRR and river
The B & O had lost access to the Long Bridge across the river in 1870 due to political maneuvering by the Baltimore and Potomac Railroad ( B & P )( controlled by the Pennsylvania Railroad ( PRR )).

PRR and called
In 1890 the PRR gained control of the Pittsburgh, Cincinnati, Chicago and St. Louis Railroad commonly called the Panhandle Route a line that ran west from Pittsburgh to Bradford, Ohio, where it split, with one line to Chicago and the other to East St. Louis, Illinois via Indianapolis, Indiana.
In 1934 the PRR received a $ 77 million loan from the New Deal's Public Works Administration To complete the electrification project initiated in 1928, work was started January 27, 1937, on the main line from Paoli to Harrisburg ; the low-grade freight line from Morrisville through Columbia to Enola Yard in Pennsylvania ; the Port Road Branch from Perryville, Maryland to Columbia ; the Jamesburg Branch and Amboy Secondary freight line from Monmouth Junction to South Amboy ; and the Landover-South End freight line from Landover, Maryland through Washington to Potomac Yard in Alexandria, Virginia ( now called the Landover Subdivision and RF & P Subdivision of CSX ).
The reciprocal of PRF ( or PRR ) is called the Pulse Repetition Time ( PRT ), Pulse Repetition Interval ( PRI ), or Inter-Pulse Period ( IPP ), which is the elapsed time from the beginning of one pulse to the beginning of the next pulse.
Until 1961 some PRR suburban trains continued to serve the Exchange Place station, where passengers could board the PRR ferry or the Hudson Tube system ( later called Port Authority Trans-Hudson or PATH ) to downtown Manhattan.
Meanwhile, Amtrak uses a modified version of the PRR position light signals called " Position Color Lights.
Unlike case-control studies, they can be used to describe, not only the Odds ratio, but also absolute risks and relative risks from prevalences ( sometimes called prevalence risk ratio, or PRR ).
It later became the West Chester Branch of the Pennsylvania Railroad ( PRR ), and is now called the Media / Elwyn Line on the SEPTA system.
Lawson ran as the PRR candidate, but withdrew on 23 April after the interior minister called for a postponement of the poll.
The microbe-specific molecules that are recognized by a given PRR are called pathogen-associated molecular patterns ( PAMPs ) and include bacterial carbohydrates ( such as lipopolysaccharide or LPS, mannose ), nucleic acids ( such as bacterial or viral DNA or RNA ), bacterial peptides ( flagellin, ax21 ), peptidoglycans and lipoteichoic acids ( from Gram positive bacteria ), N-formylmethionine, lipoproteins and fungal glucans.
The B & O built a connecting track from the Alexandria Extension to the B & P's Anacostia Railroad Bridge, which provided access to PRR tracks in southwest D. C. ( now called the CSX RF & P Subdivision ) and the Long Bridge.
A new spur, called the Cross-County Segment, would split off at Port Kennedy ( near Valley Forge ), and would allow SVM trains to access King of Prussia, Pennsylvania, and the Great Valley Corporate Center in Malvern, Pennsylvania, using the former PRR / Penn Central Trenton Cut-Off ( now Norfolk Southern's Morrisville Line ) used by the former PRR as a freight-only bypass around Philadelphia, although an alternative would be to have the Cross-County segment serve only King of Prussia with SEPTA extending the existing Norristown High-Speed Line to King of Prussia, via the Trenton Cut-Off.
Five years after passenger service was terminated, a heritage railroad called the Black River and Western Railroad ( BR & W ) began leasing the somewhat-profitable Flemington Branch from the PRR on weekends to operate steam excursion trains.
Dennison, Ohio's PRR station was named Pennsylvania Railroad Depot and Baggage Room while Fort Wayne, Indiana's station, though officially called Pennsylvania Railroad Station was also named Baker Street Station.

PRR and North
Penn Central locomotives # 4801 and # 4800, both former PRR GG1 s, haul freight through North Elizabeth, New Jersey in December 1975
This 2-10-0 steam locomotive is a Pennsylvania Railroad class PRR I1s | I1s, the most successful class of such locomotives in North America.
The Broadway Limited was the Pennsylvania Railroad's ( PRR ) premier named passenger train, operating daily in each direction between New York City and Chicago, via North Philadelphia.
NJT's Northeast Corridor Line and the North Jersey Coast were once part of the PRR, as was Amtrak which serves the commuter hub at Metropark, New Brunswick, and the Trenton Transit Center.
In North America, the power-frequency coded track circuit system developed by the Pennsylvania Railroad ( PRR ) and Union Switch & Signal ( US & S ) is the de-facto standard in the Northeast.
The line was built in 1873 from New Durham, North Bergen ( near the point now known as CP 2 ) south to the PRR at Marion Junction, with the southernmost part leased from the Erie Railroad's as their original terminus, built as the Paterson and Hudson River Railroad.
PRR North American railroad signals # Position light | position light signal
The line opened as a branch of the Connecting Railroad to Newtown on February 2, 1878, and on November 22, 1879 the North Pennsylvania Railroad began operating it, no longer of use to the PRR.
North of Ebenezer the branch continued to serve local traffic from a connection with the old PRR line to the NYC lines at Depew, but that has been cut back to a short section near Ebenezer.
In 1884, he founded the North River Bridge Company in New York, with the intent of building a massive bridge over the Hudson River for the Pennsylvania Railroad ( PRR ).

0.377 seconds.