Help


[permalink] [id link]
+
Page "Kilburn, London" ¶ 24
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Completed and 1880
Completed in 1880, Nana is the ninth installment in the 20-volume Les Rougon-Macquart series, the object of which was to tell " The Natural and Social History of a Family under the Second Empire ", the subtitle of the series.
Completed in 1880, it was dedicated to the virtuoso violinist Pablo de Sarasate.

Completed and by
Completed and opened for traffic in 1852, the bridge was designed and built by Lemuel Chenoweth and his brother, Eli, of Beverly.
Completed in about 731 ,, Bede was aided in writing this book by Albinus, abbot of St Augustine's Abbey, Canterbury.
Completed concentrations of undergraduates by area are Social Sciences ( 42 %), Humanities ( 26 %), Life Sciences ( 17 %), and the Physical Sciences ( 14 %).
Completed by P. Schuyler Miller and John D. Clark, the chronology was later revised by Clark and L. Sprague de Camp in An Informal Biography of Conan the Cimmerian ( 1952 ).
Completed in 1815, it was the first national-scale geologic map, and by far the most accurate of its time.
Completed by a third volume, the Traité de la Divinité de Nôtre Seigneur Jésus-Christ, it appeared at Rotterdam, 1689.
Completed in 1989 by the Port of Antwerp, which De Nul helped build, the company still has engineers and specialists who were part of that project.
Completed in March 2009, NIF has now conducted experiments using all 192 beams, including experiments that set new records for power delivery by a laser.
* 1977: The Impending Crisis, 1848 – 1861 by David M. Potter ( Completed and edited by Don E. Fehrenbacher )
Completed in 1976, the Faneuil Hall Marketplace ( comprising Quincy Market and other spaces adjacent to Boston's Faneuil Hall ) was designed by architect Benjamin C. Thompson and was a financial success, an act of historic preservation, and an anchor for urban revitalization.
Completed in 1997, the tunnel, approaches and related buildings were designed by the hypermodernist Dutch architectural firm Van Berkel + Bos, and was named after the Dutch naval hero Piet Hein.
Completed in 1839, it was designed by Richard Delafield and built by the United States Army Corps of Engineers.
Completed in 1936, The Problem of Indian Administrationcommonly known as the Meriam Report after the study's director, Lewis Meriamdocumented fraud and misappropriation by government agents.
Completed in 1552, they were issued by Royal Mandate on 19 June 1553.
Completed in 1896, it served as a hotel from the very beginning and was originally owned by Emil Bernhardt, a hotel manager educated in Switzerland.
Completed by his enemy Constantine, it was one of the most impressive edifices of ancient times.
Completed in 2009, Stackpole Books published Lincoln Highway Companion: A Guide to America's First Coast-to-Coast Road, authored by Brian Butko.
Completed in 1968 by the firm of Roche-Dinkeloo, the Ford Foundation Building was the first large-scale architectural building in the country to devote a substantial portion of its space to horticultural pursuits.
Completed by his son.
Completed in 1990 and designed by Michael Graves, the Team Disney Burbank building contains the office of President and CEO Robert A. Iger, as well as the boardroom for the Board of Directors.
Completed in 1958, the building was refurbished by architects Haworth Tompkins and reopened in Autumn 2007.

Completed and architect
Completed in 1942 under the direction of world renowned architect Eliel Saarinen, the museum is housed in the same building as the Cranbrook Academy of Art.
Completed in 1986, it was designed by Turkish architect Vedat Dalokay to be shaped like a desert Bedouin's tent.
Completed in 1887 and designed by architect firm Tappin, Gilbert and Dennehy, this impressive red brick building dominates a main residential corner.
Completed in 1937, this building was designed in the style of the Spanish Colonial Revival style by architect Claud S. Ashworth ( 1885-1971 ).
Completed in 1869 to the designs of architect John Thomas Rochead at a cost of £ 18, 000, the monument is a 67-metre ( 220 ft ) sandstone tower, built in the Victorian Gothic style.
Completed in 1910 and designed by Harvard architect H. Langford Warren, Flowers Hall was designed to emulate the collegiate Gothic architecture of Oxford and Cambridge, England, and of Cambridge, Massachusetts, and set the tone for the pervasive architectural style of campus buildings henceforth.

Completed and John
Completed in 2011, Old Town Helotes is the revitalized downtown of Helotes, which includes John T. Floore's Country Store, All That Glitters, L & M Feed and Supply, Mander Automotive Service, First Baptist Church of Helotes, and El Chaparrel Mexican and other Helotes originals.
Completed in 1823 and consecrated in 1824, All Souls is the only surviving building in Regent Street that was designed by John Nash.
It is also believed by them to be the beginning of a new " Completed Testament Age ," and to have fulfilled the prophesied Marriage of the Lamb in the Revelation of John.
Completed in 1913, it was commissioned by a London businessman, John Duguid, in memory of his daughter Constance, killed in a hunting accident, and her mother Adelaide, who died in 1903.
Completed in 1870, the house cost, and its first resident was John Beverley Robinson.
Completed by John Wellborn Root and Daniel Burnham of Burnham and Root in 1888, it is considered one of their masterpiece buildings.

Completed and Pearson
Completed by Karl Pearson.

Completed and church
Completed in 1914, it is the mother church of the Archdiocese of St. Louis and the seat of its archbishop, currently Robert James Carlson.
Completed in 1847, the first church building was used until 1872.
Completed in 1816, and designed by James Gillespie Graham ( 1776 – 1855 ), the church of St. Andrew formally re-introduced the Roman Catholic presence to Glasgow.
Completed in 1930, the church contains stained-glass windows and mosaics by Hildreth Meiere, and a marble baptismal font by the Danish follower of Canova, Bertel Thorvaldsen.

Completed and has
Completed in 1999, it has become Fermilab's " particle switchyard " with three functions: it accelerates protons, it delivers protons for antiproton production, and it accelerates antiprotons coming from the antiproton source.
Completed in 2008, the building has 28 en suite single rooms and 4 en suite double rooms with shared kitchens.
Completed in 1963, it covers an area of 1. 01 km² and has a capacity of 24. 5 x 10 < sup > 6 </ sup > m < sup > 3 </ sup >.
Completed in 1911, it has stood on the site for over 100 years.
Completed in 1998, the main complaint is that the 1829 seat theatre's cavernous auditorium has poor sight lines and acoustics, making it difficult for audience members in distant seats to see or hear the actors.
Completed in 2004, the building has garnered national press for its ' green ' design.
Completed in 1995 at a cost of £ 35 million, the new stand is 180 metres long, 35 metres high, has a capacity for 25, 000 people and contains 46 hospitality suites.
Completed in 1982, the space has three galleries for permanent collections and one gallery for special exhibitions.
Completed in 1970, the tower has 64 floors to and has of leasable space.
Completed when the artist was 27, the work has become an icon of French Romanticism.
Completed in 1973 under the terms of the 1964 Columbia River Treaty, the Mica powerhouse has a generating capacity of 1, 805 megawatts ( MW ).
Completed in 1992, it has 42 stories, and reaches a height of 167 m ( 548 ft ).
Completed in 1801, it has seen the premieres of many celebrated works of theatre, opera, and symphonic music.
Completed in 1934, the seawall was built on top of wood piling which has significantly deteriorated due to wood eating gribbles.
Completed 2007, the project has been shortlisted for the 2010 Aga Khan Award for Architecture
* 2009: Completed a Community Relationships Review, an in-depth detailed analysis of the state of local community relationships that has been completed in the industry.
Completed in 1970, the skyscraper has served as home to several law, financial, real estate, and corporate firms.
Completed in 1590, and destroyed in 1944, the palace has now been substantially rebuilt true to the original project.
Suppose that the machine has several states, called FindIncrements, FindSubExprs and Completed.
The Incomplete Enchanter and The Castle of Iron have also been issued together as The Compleat Enchanter ( 1975 ); Wall of Serpents has also been issued under the title The Enchanter Completed ( 1980 ); all three volumes of the original series have also been issued together as The Complete Compleat Enchanter ( 1989 ).
Completed about six months ago, this aircraft has been flying in the Moscow area for at least two months.

1.154 seconds.