[permalink] [id link]
Construction of Chilbolton Observatory started in 1963.
from
Wikipedia
Some Related Sentences
Construction and Chilbolton
* 1963-1967: Construction and commissioning of the 25M Chilbolton ( radar ) Dish at Chilbolton Observatory.
Construction and Observatory
Construction of the predecessor of the present Kamioka Observatory, the Institute for Cosmic Ray Research, University of Tokyo began in 1982 and was completed in April, 1983.
Construction and started
Construction on what would in time become the world famous Great Mosque of Córdoba was started circa the year 786.
Construction of the second line started in December 2008, which is due to be opened according to initial forecasts by the end of 2012.
Construction of Gdynia seaport was started in 1921, but because of financial difficulties was conducted slowly and with interruptions.
For the Construction of RN7 Canada Pledge US $ 75 and IDB US $ 31 Million for the construction of the road which started in 2009 ; it did suffer major setback because of the earthquake also.
In 1941, he started a company, Zuse Apparatebau ( Zuse Apparatus Construction ), to manufacture his machines.
The contract to build the tunnels was won by John Mowlem and Co. Construction of the tunnels started in February 1915 from a series of shafts.
Construction started in 1840 and lasted for thirty years, suffering great delays and cost overruns, as well as the death of both leading architects ; works for the interior decoration continued intermittently well into the twentieth century.
In the 90s the new country started the ' National Programme of Highway Construction ', effectively re-using the old communist plans.
Construction on the French house was initially started before 1789, interrupted by the French Revolution for twenty years and then finally built 1812 – 1817 ( based on Salat's pre-1789 design ).
Construction of Shasta Dam, the main dam on the Sacramento, started in 1938 and was completed in 1945.
* 518 BC — Construction of Apadana ( audience hall ) of Darius and Xerxes, ceremonial complex, at Persepolis, Iran started.
Construction started on August 13, 1963, when Prime Minister Lester B. Pearson pulled a lever that signalled a front-end loader to dump the first batch of fill to enlarge Île Sainte-Hélène.
Having accomplished that, Chiang Ching-kuo proposed and the government then started state projects such as the Ten Major Construction Projects that provided the infrastructure for building a strong export-driven economy.
Construction and 1963
The building was designed by Richard Seifert with engineers Pell Frischmann and was constructed by Wimpey Construction from 1963 to 1966.
Li, born into ordinary peasant family on September 1934 ; worked as construction worker in Beijing Third Construction Company, 1951 – 1965 ; attended spare-time architecture engineering institute, 1958 – 1963 ; and received college certificate.
The Theory and Practical Construction of Computation Charts, 5th ed., ( London: Sir Isaac Pitman & Sons, Ltd .) 1963.
Construction of the car factory began in 1961 to produce the Hillman Imp, a revolutionary small car which went into production when the factory was opened on 2 May 1963, and was not discontinued until 1976.
In 1962 he lived in New York for a year before relocating to Communist China from 1963 until 1965, where he worked as a translator on the French edition of the magazine China Under Construction until his disillusionment with Maoism.
In 1963, Congress passed the Mental Retardation Facilities and Community Mental Health Centers Construction Act, beginning a new era in Federal support for mental health services.
Construction of the Underground Complex ( UGC ) took four years, August 1959 to September 1963 — 1 1 / 2 years for excavation, 2 1 / 2 years to build and outfit the centre.
* July 1963, Utah Construction and Mining Company and two local firms won contracts to construct the tailrace tunnel and Wilmot Pass road.
* The Mental Retardation Facilities Construction Act of 1963 authorized federal support for the construction of university-affiliated training facilities, mental retardation research centers, and community service facilities for adults and children with mental retardation.
Construction began in August 1963, and, after additional controversy over the height and siting of the fifth building, was completed in January 1971.
0.339 seconds.