Help


[permalink] [id link]
+
Page "Auburn, Alabama" ¶ 11
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Construction and Interstate
One can examine the specifics of environmental science by reading examples of Environmental Impact Statements prepared under NEPA such as: Wastewater treatment expansion options discharging into the San Diego / Tijuana Estuary, Expansion of the San Francisco International Airport, Development of the Houston, Metro Transportation system, Expansion of the metropolitan Boston MBTA transit system, and Construction of Interstate 66 through Arlington, Virginia.
Construction in the urban areas of Corpus Christi and San Antonio began in the 1960s and the segments of the Interstate Highway in rural areas were completed by the 1980s.
* Interstate 69 ( Under Construction )
Construction finished in 2006 on the Shrewsbury – Lansdowne Interstate 44 St. Louis MetroLink station on the eastern edge of the city, at Lansdowne Avenue and River Des Peres Boulevard.
Construction of the portion of Interstate 78 built between Exit 11 ( County Route 614 ) and Exit 13 in Union Township, completed in 1962, modified the alignment of U. S. Route 22 between these two points.
Construction on Interstate 980 began in the 1960s, but was not completed until 1985 ; officially the freeway was designated as I-980 from its opening.
Construction of Interstate 95 into downtown Boston was cancelled in 1972 after local protest over the necessary demolition.
Construction began in 1957 with the first section, mostly north of LAX Airport being completed in 1961 ( signed as SR 7 ) followed by sections west of Interstate 605 within the following few years.
Construction required the already existing Mulholland Highway to be re-routed 1. 1 miles to the south along a new 579-foot-long bridge, the Mulholland Drive Bridge, to span Interstate 405.
Construction was also underway in 2011 to widen and improve both Highway 402 on the Canadian side and co-signed Interstate 94 / 69 on the American side approaching the Blue Water Bridge.
Construction is in progress to upgrade US 71 to Interstate standards as an extension of Interstate 49, with the I-49 designation expected by the end of 2012 ; preliminary signage is being installed, including I-49 mile markers.
Construction of the North River Tunnels, containerization, and the Interstate Highway System, made the area less viable.
Construction started on the first segment in 1961, and the Lodge Freeway was designated Business Spur Interstate 696 ( BS I-696 ) the following year.
Construction began on November 29, 2010 to extend the Northern terminus of SR 417 from Interstate 4 to International Parkway.
Construction on Interstate 494 first began in the late 1950s, and it was finally completed in 1985.
Construction on Interstate 579 was not completed until 1989, with the opening of the Veterans Bridge, and the opening of Interstate 579 was concurrent with the opening of an extension of Interstate 279 into the North Hills region of the Pittsburgh metropolitan area.
Construction of Interstate 394 occurred mainly in the 1980s, starting at the western terminus in Minnetonka and opening in sections toward downtown Minneapolis throughout the late 1980s.
Construction began in 1952, several years before the Eisenhower Interstate System was funded.
* Construction of the High Desert Corridor, a freeway and expressway between State Route 14, Antelope Valley Freeway, in Palmdale and Interstate 15, Mojave Freeway, near Victorville
Construction of Interstate 95 in May 1976 shows the original elevated structure and new portal built as part of the line's relocation project.
The Four Seasons site, at the new intersection of Interstate 40 and US 29-A / US 70-A ( modern day High Point Road ), was earmarked as the location for the signature development of Imperial Construction, the predecessor company to Koury Corporation, which was also owned and operated by Koury.

Construction and 85
Construction of the first structures ( at the Highway 85 / 87 and Highway 85 / Stevens Creek interchanges ) began in approximately 1987-1988.
* Building Design & Construction Systems ( 85 multiple choice questions and three vignettes in accessibility, roof plan and stair design )

Construction and beginning
Construction efforts ground to a halt for nearly two years beginning in 1977, as a result of city-wide financial hardships.
* Construction of a three tier Roman aqueduct beginning in Nîmes and running for 269 miles.
Construction on the campus all but ceased after the Administration building, Aldrich Hall, was completed in 1974, and then resumed in the late 1980s, beginning a massive building boom that still continues today.
Construction beginning in 1829, the Little Schuylkill Railroad ran from Port Clinton northward to Mahanoy Junction above Tamaqua.
Construction of the Augusta Canal in the 1830s required Columbia County's cooperation, as the beginning of the canal and the locks were within the county.
Construction of the original Southern Pacific-SP railroad depot was the beginning of the downtown core.
The townsite was established by three lot sales beginning with the Canadian Valley Construction Company sale on September 19, 1906.
Construction began in the Kawartha Lakes region in 1833 with the Lock at Bobcaygeon marking its beginning.
Construction of the Great Mosque at Córdoba ( now a cathedral known as the Mezquita ) beginning in 785 CE marks the beginning of Islamic architecture in the Iberian peninsula and North Africa ( see Moors ).
Construction began in January 1999, with work beginning on the installation of the 4, 900 glass panels commencing in summer 2000.
Construction was completed by the end of the summer of 1987, officially opening in September 1987, five months before the beginning of the Olympics.
In 1963, Congress passed the Mental Retardation Facilities and Community Mental Health Centers Construction Act, beginning a new era in Federal support for mental health services.
Born into a Roman Catholic family, he became a mechanic, just before the beginning of WWII, with the Société Nationale d ' Étude et de Construction de Moteurs d ' Aviation.
Construction of phase 2 began in April 2007, and ended when the keys to the building were handed over at an official ceremony in September 2008, and the beginning of the fitting out of the BBC Hoddinott Hall by BBC Wales.
Construction of the CNMS facility began in August 2003 and was completed in April 2005, with the nanoscience user research program beginning operation in October 2005.
Construction commenced on a new production facility in Graz, where the new cross-country vehicle would be assembled nearly entirely by hand in 1975, with production of the " G Model " beginning in Graz in 1979.
Construction began for the Superior Hiking Trail in the mid-1980s, beginning in Duluth MN and extending 275 miles to the Canadian border.
Construction commenced in October 1984, with tunnelling beginning in June 1985.
In January 2001, KRTC signed the " Construction and Operation Agreement " and the " Development Agreement " with the Kaohsiung City Government, signaling the beginning of construction of the KMRT system.
Construction, which was undertaken by Bovis, commenced in June 1999, with the demolition of the Scottish and Newcastle brewery and the beginning of foundation work to support the structure of the building.
Construction works began end of 2007 and are supposed to be finished at the beginning of the 2009 – 10 season.
Construction is expected to take approximately two years, with anticipated occupancy beginning in January 2013.
Construction has taken place over several stages, beginning in 1962, with the final section of the original route being completed similar to the original plans in 2006.

0.516 seconds.