Help


[permalink] [id link]
+
Page "South Luzon Expressway" ¶ 22
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Construction and road
CPRR logo on a gilded " Staff " uniform button ( 1867 ) Construction of the road was financed primarily by 30-year, 6 % U. S. Government Bonds authorized by Sec.
For the Construction of RN7 Canada Pledge US $ 75 and IDB US $ 31 Million for the construction of the road which started in 2009 ; it did suffer major setback because of the earthquake also.
Construction is underway on an east-west road ( the so-called Millennium Road ) that incorporates the already existing road from Ulaanbaatar to Arvaikheer, and on the extension of the Darkhan-Bulgan road beyond Bulgan.
Construction of the outer big ring road started in 2011.
The Atlantic road was voted the Norwegian Construction of the Century in 2005.
Construction of the National Road stopped in 1839, and much of the road through Indiana and Illinois remained unfinished, and was later transferred to the states.
Construction on the road began on 19 September 1919, built by approximately 3, 000 returned servicemen as a war memorial for fellow servicemen who had been killed in World War I.
Construction started in 1951 and the road was completed in 1957.
Construction began near the US-89 / I-15 interchange in Farmington in 2004, but was soon halted due to a lawsuit filed by environmentalists, who were concerned that the road would harm marshlands along the eastern edge of the Great Salt Lake and asked for a review of the completeness of the environmental impact statement.
Construction is currently under way to widen the road from four to six lanes with the project expected to be completed by 2012.
Construction didn't even begin until a month before Opening Day ; after starting the season on a long road trip, the Blue Sox managed to sell out their home opener in late May, with thousands of fans turned away.
Construction and housing starts have been up has well as large investments in the community by national companies and major new road construction projects.
Construction vehicles have smaller road wheels that are designed primarily to prevent track derailment and they are normally contained in a single bogie that includes the idler wheel and sometimes the sprocket.
Construction of the Natchez Trace began in 1802, and work continued on improving the road until it was officially declared complete in 1809.
Construction on the access road was completed in 1943 at a cost of over $ 2 million.
Construction of a replacement ' Chelmer Viaduct ' A138 road which connects Chelmer Village Way roundabout to the Army and Navy roundabout will begin in the summer of 2012, to replace the existing 1932 structure which will remain open during construction.
An accord was signed in April 2012 with the China Railway Construction Corp for a $ 11bn road and double track rail bridge.
Construction along Ontario Highway 401, widening the road from six to twelve travel lanes.
The M3 motorway, owned by Siac Construction and Cintra, S. A., which opened in June 2010, passes through the Tara-Skryne Valley-as does the existing N3 road.
Construction of the new airport was only part of the Airport Core Programme, which also involved construction of new road and rail links to the airport, with associated bridges and tunnels, and major land reclamation projects on both Hong Kong Island and in Kowloon.
Construction of the new runway resulted in April 2011 in the permanent closure of Barlow Trail and McCall Way's connections between Airport Road and McKnight Boulevard to the south ; road access to the rest of Calgary now requires motorists to drive north of the airport ( away from downtown ) on Barlow and access either Deerfoot Trail via Airport Trail or 36 Street or Metis Trail via Country Hills Boulevard.
Construction started on the route in February 2009, with the works completed and the new road opening 1 March 2011.
Construction of the road, once started, was an 18-year project.

Construction and started
Construction on what would in time become the world famous Great Mosque of Córdoba was started circa the year 786.
Construction of the second line started in December 2008, which is due to be opened according to initial forecasts by the end of 2012.
Construction started in 1705 and the house was completed in 1722, the year of his death.
Construction of Gdynia seaport was started in 1921, but because of financial difficulties was conducted slowly and with interruptions.
Construction started in 1977 and was completed in 1980.
In 1941, he started a company, Zuse Apparatebau ( Zuse Apparatus Construction ), to manufacture his machines.
The contract to build the tunnels was won by John Mowlem and Co. Construction of the tunnels started in February 1915 from a series of shafts.
Construction started in January 1943, and the first prototype was delivered in June 1943.
Construction started in 1840 and lasted for thirty years, suffering great delays and cost overruns, as well as the death of both leading architects ; works for the interior decoration continued intermittently well into the twentieth century.
In the 90s the new country started the ' National Programme of Highway Construction ', effectively re-using the old communist plans.
Construction on the French house was initially started before 1789, interrupted by the French Revolution for twenty years and then finally built 1812 – 1817 ( based on Salat's pre-1789 design ).
Construction started in 1952 and lasted until 1955.
* Construction of the Berlin Wall started in 1961.
* Construction started in 1998 on the International Space Station.
* Construction of the Dome of the Rock is started in Jerusalem.
Construction of Shasta Dam, the main dam on the Sacramento, started in 1938 and was completed in 1945.
Construction of the Chapel started in 1505, directed by its designer, Enrique Egas.
* 518 BC — Construction of Apadana ( audience hall ) of Darius and Xerxes, ceremonial complex, at Persepolis, Iran started.
Construction of this bridge started in 1876, and was completed in 1897.
Construction was started in 1973 and completed in 1979 at a cost of $ 139 Million.
Construction started on August 13, 1963, when Prime Minister Lester B. Pearson pulled a lever that signalled a front-end loader to dump the first batch of fill to enlarge Île Sainte-Hélène.
Having accomplished that, Chiang Ching-kuo proposed and the government then started state projects such as the Ten Major Construction Projects that provided the infrastructure for building a strong export-driven economy.
Construction started in 1853, and the temple was dedicated on April 6, 1893.

0.292 seconds.