Help


[permalink] [id link]
+
Page "Telegraphy" ¶ 12
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Construction and Prussian
The original main building was built between 1908 and 1913 by the Prussian Construction and Financial Direction of Berlin, then responsible for public constructions in the city.

Construction and telegraph
Mu-metal was developed by scientists named Smith and Garnett and patented in 1923 for inductive loading of submarine telegraph cables by The Telegraph Construction and Maintenance Co. Ltd. ( now Telcon Metals Ltd .), a British firm which built the Atlantic undersea telegraph cables.
Construction of the telegraph line between Gingin and Perth was completed in 1886, and the railway line was completed in 1891.

Construction and line
Construction of the second line started in December 2008, which is due to be opened according to initial forecasts by the end of 2012.
Construction was stopped on a 7-block extension to the line due to the removal and scrapping of rails, ties, and other items of railroad equipment by the DOT, which were stored on land that was slated for the " Fairway " supermarket project.
Construction of an entirely new line from Karlovac to Rijeka, and reconstruction of the line from the Hungarian border to Karlovac should have originally begun in the Fall of 2007.
According to Mark Bollman, a mathematics and calculator historian and associate professor of mathematics at Albion College, the " Construction Master is the first in a long and profitable line of CI construction calculators " which carried them through the 1980s, 1990s, and to the present.
30 October 2006: President Olusegun Obasanjo signed a contract with China Civil Engineering Construction Corporation to modernise the Lagos to Kano railway line.
Construction of a high speed railroad line between Ankara and Konya was begun in order to connect the two cities with a direct line and reduced travel time from several hours to approximately one hour.
Timothy V. Waters argues in " On the Legal Construction of Ethnic Cleansing " that the expulsions of the ethnic German population east of the Oder-Neisse line the Sudetenland and elsewhere in Eastern Europe without legal redress ( cf.
Construction began on its first tram line in 1909 with the first passenger service commencing in 30 May 1910.
Construction of the perpendicular ( blue ) to the line AB through the point P.
Construction of the GR & I continued for several years until the line reached Petoskey in December 1873.
Construction of the Highland Park Ford Plant was completed in 1909, and the area's population dramatically increased just a few years later in 1913, when Henry Ford opened the first assembly line at the plant.
Construction was also progressing on the rail line.
Construction progressed better than expected ; at three points along the line of the dike there were deeper underwater trenches where the tidal current was much stronger than elsewhere.
Construction of a train link, Kehärata, to the centre of Helsinki began in the spring of 2009 and the line is planned to go into operation in 2014.
Construction began on the branch line, and about of canal was built, from Stratton Common towards Frome, passing through Coleford and Vobster.
Construction of a RMB92. 3 billion passenger-only railway line running from Harbin-Dalian began in August 2007.
Conversely, in 2004 the South Korean government charged the Korean High Speed Rail Construction Authority, a public entity, to construct its high speed rail line, 412 km from Seoul to Busan, in two phases.
Construction work on the whole line began immediately.
Construction of the high-speed rail line between Madrid and Seville began in 1988 and operation commenced in 1991.
Construction was finally completed on April 13, 1955 when the railway line and roadway were finished at a cost of $ 22 million ( CAD ).
Construction of a new and even more formidable defence line was begun at Paterangi, some thirty kilometers south of Ngaruawahia.
Construction of the Victoria line station tunnels with their platforms, the new escalator shafts and the linking passages to the Central line platforms was carried out from access shafts sunk from nearby Cavendish Square, Upper Regent Street and Argyll Street.

Construction and |
Construction of a high temperature proton exchange membrane fuel cell | PEMFC: Bipolar plate as electrode with in-milled gas channel structure, fabricated from conductive composite material | composite s ( enhanced with graphite, carbon black, carbon fiber, and / or carbon nanotube s for more conductivity ); Porous carbon papers ; reactive layer, usually on the polymer membrane applied ; polymer membrane. Condensation of water produced by a PEMFC on the air channel wall.
Image: Construction tour eiffel. JPG | 18 July 1887
Image: Construction tour eiffel2. JPG | 7 December 1887
Image: Construction tour eiffel3. JPG | 20 March 1888
Image: Construction tour eiffel4. JPG | 15 May 1888
Image: Construction tour eiffel5. JPG | 21 August 1888
Image: Construction tour eiffel6. JPG | 26 December 1888
Image: Construction tour eiffel8. JPG | March 1889
File: Printing Engineering and Construction Engineering department building. jpg | The department building of both the Printing Engineering and Construction Engineering departments
| valign = top | Communist Party of ChinaRevolutionary Committee of The Chinese KuomintangChina Democratic LeagueChina Democratic National Construction AssociationChina Association for Promoting DemocracyChinese Peasants ' and Workers ' Democratic PartyChina Zhi Gong DangJiusan SocietyTaiwan Democratic Self-Government Leaguenonparty personage
File: New Construction. jpg | Bricks made from local mud.
File: Arches Under Construction. jpg | Arches supported by concrete pillars
File: Adobe Arches in Merzouga. jpg | Construction in Merzoura, Morocco
File: WTCConstruction-March-2010. jpeg | Construction as of March 2, 2010.
Image: Limehouse development 3. jpg | Construction of apartments on Commercial Road ( now complete ).
Image: Lake Village Road Construction. JPG | In June
Image: Gateway_Bridge_aerial3. JPG | Sir Leo Hielscher Bridge Construction
Image: Gateway Bridge construction. JPG | Sir Leo Hielscher Bridge Construction
Image: Gateway Bridge aerial2. JPG | Sir Leo Hielscher Bridge Construction
Image: Gateway Bridge aerial. JPG | Sir Leo Hielscher Bridge Construction
Image: gatewaybridge2. jpg | Construction continues on 26 Jan 2010

1.530 seconds.