Help


[permalink] [id link]
+
Page "Bruce Nuclear Generating Station" ¶ 89
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Estimated and cost
Estimated annual savings resulting from publication of the Journal and Bulletin on a triservice basis, as compared with the cost of producing separate periodicals for each service, were between $65,000 and $70,000.
Estimated cost for new dreadnoughts was placed at 36. 5 million GM for 19, 000 ton displacement ships ( larger than Dreadnought at 17, 900 tons ), and 27. 5 million GM for battlecruisers.
Estimated cost of the project is $ 56 Million, which the high school component having cost $ 20 Million.
* Estimated cost for installation is about half that of central refrigerated air conditioning.
* Estimated cost of operation is 1 / 4 that of refrigerated air.
Estimated in 2003 to cost $ 23. 5 million, it is currently unfunded and scheduled for reprioritization.
Estimated by the firm at $ 350, 000, the winning contractor bid $ 377, 978, but by the building's dedication on December 28, 1894, it had cost nearly $ 900, 000.
Estimated to cost US $ 1. 1 billion to build, it is projected that the line will either run in existing right-of-way adjacent to the HVDC line that runs through New Hampshire, or it will connect to a right-of-way in northern New Hampshire that will run through the White Mountains.
On 15 August 2010, India's Independence Day, the Taj Mahal Palace, was reopened after restoration, The cost of the restoration of the hotel so far has been 1. 75 billion Rupees ( Estimated $ 40 Million USD ).
Estimated ridership according to the Phase 2 DEIR would have been 40, 000 for 2003, at a capital cost of $ 100 million, for low-floor, low-emissions buses.
Estimated cost is at P6. 1 billion, inclusive of operating equipment and other facilities with commercial operations expected to begin by June 2016.
Estimated to cost $ 266 million to complete, it was designed primarily as a two-lane controlled-access facility.
Estimated cost of $ 3. 5 million.
Estimated cost of $ 4 million.

Estimated and for
Estimated GDP per capita in purchasing power parity ( PPP ) in 2010 was around USD 19, 754 or 63. 3 % of the EU average for the same year.
Estimated to be completed within six to eight months, it had first been proposed and then postponed for 43 years previously by the then government.
Estimated sales for all first generation models: 65, 000
Estimated sales for all second generation models: 60, 000
Estimated sales for all third generation models: 40, 000 to 50, 000
* Estimated completion date for the Kingdom Tower in Saudi Arabia which is expected to become the tallest building in the world and the first to reach 1 kilometer in height.
* Estimated completion date for the Compass navigation system.
Estimated per capita income in 2007 was $ 18, 674 in Ellwood City, versus $ 26, 228 for the entire state.
Estimated median house or condo value in 2007 was $ 91, 245 ( it was $ 75, 700 in 2000 ), versus $ 155, 000 for the state.
Estimated population ( Mid 2007, via NSDC Stats & Info ) is 26, 330 for the Newark Parish.
Estimated value in excess of $ 1M. Philatelic investment is investment in collectible postage stamps for the purpose of realizing a profit.
* Estimated date of confinement, a term for the estimated delivery date for a pregnant woman
Estimated speciation dates for the japonicum group: ~ 3. 8 million years ago for S. japonicum / South East Asian schistosoma and ~ 2. 5 million years ago for S. malayensis / S.
Estimated completion and opening of the attraction is penned for January 2013.
Estimated total annual flows for the basin have ranged from 5, 000 gigalitres in 1902 to 57, 000 gigalitres in 1956.
Estimated to be completed in 2015, this expansion will create room for even more shops leading up to the luxury department store, and will also be accompanied by a new parking structure, according to the mall's owner and developer, Simon Property Group.
* Estimated Average Requirements for nutritional needs
Estimated levels of protection for the Leopard 2 range from 590-690 RHAe on the turret, 600 RHAe on the glacis and lower front hull on the Leopard 2A4, to 920-940 RHAe on the turret, 620 RHAe on the glacis and lower front hull on the Leopard 2A6 against kinetic projectiles.

Estimated and project
Estimated at US $ 5. 2 billion, the Tampakan mining project is the Philippines ’ largest.
Estimated costs for this 58 km long project are 800 Million Dirham .. Main reason for expansion is the expected traffic growth, which is calculated at 55-79 % between 2010 and 2020, depending on the stretch of road

Estimated and grew
Estimated to have a strength of 100, 000 in June 1944, the FFI grew rapidly, doubling by the following month, and reaching approximately 400, 000 by October of that year.

Estimated and $
" Estimated $ 200 million was lost in these scams.
Estimated median household income in 2008: $ 71, 806 ( it was $ 53, 624 in 2000 )
Estimated per capita income in 2008: $ 28, 330
Estimated median house or condo value in 2008: $ 393, 609 ( it was $ 172, 800 in 2000 )
Estimated median household income in 2008: $ 56, 361 ( it was $ 44, 250 in 2000 )
Estimated per capita income in 2008: $ 26, 140
Estimated median house or condo value in 2008: $ 208, 186 ( it was $ 110, 800 in 2000 )
Estimated median household income in 2007: $ 47, 545.
Estimated median house or condo value in 2007: $ 62, 681.
Estimated median household income in 2005: $ 38, 400 ( it was $ 37, 961 in 2000 ).
Estimated median house / condo value in 2005: $ 74, 700 ( it was $ 66, 100 in 2000 ).
Estimated median household income in 2008: $ 92, 689 ( it was $ 74, 375 in 2000 )
Estimated per capita income in 2008: $ 37, 010
Estimated median house or condo value in 2008: $ 229, 212 ( it was $ 141, 700 in 2000 )
Estimated median house / condo value in 2005: $ 345, 100.
Estimated median household income in 2007: $ 113, 270.
Estimated median household income in 2008: $ 99, 833 ( it was $ 79, 493 in 2000 ) making it one of the highest earning CDP's in the county.

0.899 seconds.