[permalink] [id link]
If the work breakdown structure designer attempts to capture any action-oriented details in the WBS, he will likely include either too many actions or too few actions.
from
Wikipedia
Some Related Sentences
If and work
He added, `` If this doesn't work out, the three of you barricade yourself in the house and talk terms with them ''.
If communications work, his decision would be instantly known in all command posts that would originate the actual go order.
If a work is divided into several large segments, a last-minute drawing of random numbers may determine the order of the segments for any particular performance.
If he thus achieves a lyrical, dreamlike, drugged intensity, he pays the price for his indulgence by producing work -- Allen Ginsberg's `` Howl '' is a striking example of this tendency -- that is disoriented, Dionysian but without depth and without Apollonian control.
If notched for the battens, they would require more work, be weakened and limber holes would have to be bored so that bilge water could flow through.
If the artist would study his work more thoroughly and move certain units in his design, often only slightly, finer pictures would result.
If work is substituted for things ( with more exact contribution to meaning ), it will have dominant stress.
If you have a year-round, full-time job you can't expect to grow much more than your family uses -- unless other members of the family do a good deal of the work or you hire help.
If an expensive and specialized piece of machinery is needed -- such as a spray rig, a combine, or a binder -- it is better to pay someone with a machine to do the work.
If one wishes to discuss a literary figure who uses folklore in his work, the first thing he must realize is that the literary figure is probably part of this ignorant American public.
If working in a zinc mine, which he once did for 87-1/2 cents an hour, paid more than playing center field for the Yankees, Mantle would work in a zinc mine.
" If you live in a country like Sweden, with five, six months of snow, and the sun disappears totally for like two months, that would be reflected in the work of artists ," he said.
If the author wished, he could apply for a second 14 ‑ year monopoly grant, but after that the work entered the public domain, so it could be used and built upon by others.
If the author has been dead more than 70 years, the work is in the public domain in most, but not all, countries.
If software is faulty ( buggy ), it can delete a person's work, crash the computer and do other unexpected things.
In the words of Henry Chadwick, " If the Consolation contains nothing distinctively Christian, it is also relevant that it contains nothing specifically pagan either ... is a work written by a Platonist who is also a Christian, but is not a Christian work.
:” If we observe the totality of Pissarro ’ s work, we find there, despite fluctuations, not only an extreme artistic will, never belied, but also an essentially intuitive, purebred art.
If we work hard to sell our own cars, we won ’ t be bothered by whatever the other manufacturers do.
In It's Not Funny If I Have to Explain It, Adams recounts having been attacked for the alleged political content of his work, although in the case of one such strip ( where oil drilling kills a unicorn ) he excuses himself by saying " I just thought the image was funny.
If and breakdown
If sugars are heated so that all water of crystallisation is driven off, then caramelization starts, with the sugar undergoing thermal decomposition with the formation of carbon, and other breakdown products producing caramel.
If the user has built up a substantial charge, the discharge can jump around the door's edge or pass through the door itself ( dielectric breakdown ).
If the applied electric field is sufficiently high, free electrons from background radiation may become accelerated to velocities that can liberate additional electrons during collisions with neutral atoms or molecules in a process called avalanche breakdown.
If insufficient current exists through D, then U < sub > OUT </ sub > will be unregulated, and less than the nominal breakdown voltage ( this differs to voltage regulator tubes where the output voltage will be higher than nominal and could rise as high as U < sub > IN </ sub >).
If the current through D is I < sub > D </ sub >, its breakdown voltage V < sub > B </ sub > and its maximum power dissipation P < sub > MAX </ sub >, then < math > I_D V_B < P_
If breakdown occurs in the passive film due to chemical or mechanical factors, the resulting major modes of corrosion may include pitting corrosion, crevice corrosion and stress corrosion cracking.
If a positive potential V < sub > G </ sub > is applied at the gate terminal with respect to the cathode, the breakdown of the junction J < sub > 2 </ sub > occurs at a lower value of V < sub > AK </ sub >.
If the voltage increases beyond the design limit, the diode goes into avalanche breakdown, causing the harmful voltage to be conducted to ground.
If very high gain is needed ( 10 < sup > 5 </ sup > to 10 < sup > 6 </ sup >), certain APDs ( single-photon avalanche diodes ) can be operated with a reverse voltage above the APD's breakdown voltage.
If the input voltage continues increasing and exceeds the base-emitter breakdown voltage, the base-emitter junction of the transistor driven by the lower input voltage breaks down.
If ' the breakdown of the persona constitutes the typical Jungian moment both in therapy and in development ', it is this which opens the road to the shadow within, coming about when ' Beneath the surface a person is suffering from a deadly boredom that makes everything seem meaningless and empty ... as if the initial encounter with the Self casts a dark shadow ahead of time '.
In 1993, in the Institute of Development Communication's Faculty papers series, Alexander Flor proposed that the definition of Development Communication expanded from the perspective of cybernetics and general systems theory: If information counters entropy and societal breakdown is a type of entropy, then there must be a specific type of information that counters societal entropy.
If this voltage exceeds the dielectric breakdown strength of the insulating material of the line then an arc will occur.
If the voltage is sufficiently high, complete electrical breakdown of the air will culminate in an electrical spark or arc that bridges the entire gap.
If this " official " chronology is to believed, Capote stopped work on Answered Prayers in September 1977 after suffering what he considered to be a " nervous breakdown ".
If a SPAD is observed by an analogue curve-tracer, it is possible to observe a bifurcation of the current-voltage characteristics beyond breakdown, during the voltage sweeps applied to the device.
If the SPAD is triggered during a sweep above breakdown, a transition from the off-branch to the on-branch can be easily observed ( like a " flickering ").
:( 2 ) If the breakdown is of such severity as to necessitate a long period of rest and treatment in the United Kingdom.
:( 4 ) If the disability is a mental breakdown or psychosis requiring treatment in a mental hospital.
If the employer caused the illness, e. g. a nervous breakdown, it may be less reasonable to dismiss, and the employer could end up liable for more compensation and for a longer time.
If the breakdown in relations could have been caused by several staff then all must be given warnings and eventually all may have to be dismissed if one culprit cannot fairly be singled out.
0.277 seconds.