Help


[permalink] [id link]
+
Page "Toshiba 4S" ¶ 7
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

NRC and received
At Chicago, he had received a grant from the National Research Council ( NRC ) which had paid for much of his work on isotope separation.
The Government Affairs Vice President confirmed that the Metropolitan Edison Company, which operated the company, had shortly before received a warning from the Nuclear Regulatory Commission ( NRC ) that Babcock and Wilcox reactor valves were vulnerable to failure under certain conditions.
Also in 1987, Donner received the Henriёtte Roland-Holst Prize, one of the Netherlands ' most prestigious literary awards, for Na mijn dood geschreven (" Written after my death "), a selection from the mini-columns he had written for NRC Handelsblad.
In November 2010 CNS received its license renewal, which was the 60th renewal license to be issued by the NRC.
Byron Unit One received its operating license from the NRC on February 14, 1985 and Unit Two received its license on January 30, 1987.

NRC and latest
The NRC is aware of this barrier, and has held a number of public reviews to devise a new scheme that would make it financially feasible to build and operate small reactors, while at the same time maintaining appropriate level of protection at large LWR installations, the latest of which took place in December 2010, setting January 2011 as the time frame for preparation of official white paper proposal.

NRC and version
During the late 1980s and early 1990s, a modified version of the NRC Telephone Talking Clock was transmitted over television channel CPAC while the House of Commons was not sitting.

NRC and from
Acheampong became head of state, and the NRC ruled from 1972 to 1975.
Due to the success of Council-directed research in producing a sound-based method of detecting submarines, as well as other military innovations, the NRC was retained at the end of the war, though it was gradually decoupled from the military.
Angry that Met Ed had not informed them before conducting a steam venting from the plant, and convinced that the company was downplaying the severity of the accident, state officials turned to the NRC.
After receiving word of the accident from Met Ed, the NRC had activated its emergency response headquarters in Bethesda, Maryland and sent staff members to Three Mile Island.
According to the official figures, as compiled by the 1979 Kemeny Commission from Metropolitan Edison and NRC data, a maximum of 480 petabecquerels ( 13 million curies ) of radioactive noble gases ( primarily xenon ) were released by the event.
The heaviest criticism from the Kemeny Commission concluded that " fundamental changes were necessary in the organization, procedures, practices ' and above all – in the attitudes ' of the NRC the nuclear industry.
The Nuclear Regulatory Commission ( NRC ) is an independent agency of the United States government that was established by the Energy Reorganization Act of 1974 from the United States Atomic Energy Commission, and was first opened January 19, 1975.
A total of 45 groups and individuals from across the nation are formally asking the NRC to immediately suspend all licensing and other activities at 21 proposed nuclear reactor projects in 15 states until the NRC completes a thorough post-Fukushima reactor crisis examination:
* Historic technical reports from the NRC ( and other Federal agencies ) are available in the Technical Reports Archive and Image Library ( TRAIL )
* The Nuclear Regulatory Commission ( NRC ) was established by the Energy Reorganization Act of 1974 from the United States Atomic Energy Commission, and was first opened January 19, 1975.
In an interview with NRC Handelsblad on 1 July, Alexander Pechtold raised his suspicion that VVD and CDA had already for a long time been prepared to drop D66 from the coalition in favor of the support by Pim Fortuyn List ( LPF ).
A revived interest in the nuclear power generation field led to Westinghouse's development of the AP1000 reactor, the first Generation III + reactor to receive final design approval from the NRC.
A great deal of research at the NRC has gone into the designs of many popular speakers from Canadian speaker manufacturers like PSB Speakers, Energy Loudspeakers and Paradigm Electronics.
However, a May 17, 2011, entry on their official blog from NRC historian Tom Welleck argues that this account is effectively an urban legend and arose many years after the event.
AECL also took over operation of Chalk River from the NRC.
The SAA is a single-number rating of sound absorption properties of a material similar to NRC, except that the sound absorption values employed in the averaging are taken at the twelve one-third octave bands from 200 Hz to 2500 Hz, inclusive, and rounding is to the nearest multiple of 0. 01.
NYSERDA holds a license from the NRC, which has ultimate jurisdiction over high-level nuclear wastes.
Other forums on the site are available to all DX ' ers, but most forums containing columns from DX News are accessible only to NRC members.
CSRF, owned and operated by NRC, grew from the initial beamline to a total of three by 1998.
Assembling these required matching funds has been called " an unprecedented level of collaboration among governments, universities, and industry in Canada " and Bancroft-leader of the rival UWO bid-anckowledged the " Herculean " efforts of the Saskatchewan team in obtaining funds from the University, the City of Saskatoon, Saskatchewan Power, NRC, the Provincial Government of Saskatchewan, and Western Economic Diversification.
Mapping of land use / land cover ( LULC ) on 1: 250, 000 scale has been envisaged under Natural Resource Census ( NRC ) project of National Natural Resource Management System ( NNRMS ) using multi-temporal Resourcesat-1 AWiFS data on annual basis from 2004 onward.

NRC and reactor
In the end the reactor was brought under control, although full details of the accident were not discovered until much later, following extensive investigations by both a presidential commission and the NRC.
The closure of these valves was a violation of a key NRC rule, according to which the reactor must be shut down if all auxiliary feed pumps are closed for maintenance.
He further wrote: " We didn't learn for years — until the reactor vessel was physically opened — that by the time the plant operator called the NRC at about 8 am, roughly ½ of the uranium fuel had already melted.
In 2009, the NRC granted a license extension which means the TMI-1 reactor may operate until April 19, 2034.
The NRC oversees reactor safety and security, reactor licensing and renewal, radioactive material safety, and spent fuel management ( storage, security, recycling, and disposal ).
He has been critical of the NRC's decision-making on the proposed Westinghouse AP1000 reactor design and the NRC response to the Fukushima Daiichi nuclear disaster.
In addition, the petition asks the NRC to halt proceedings to approve the standardized AP1000 and ESBWR reactor designs.
The NRC oversees reactor safety and security, reactor licensing and renewal, radioactive material safety, and spent fuel management ( storage, security, recycling, and disposal ).
In October 2010, GE Hitachi Nuclear Energy signed a memorandum of understanding with the operators of the Department of Energy's Savannah River site, which should allow the construction of a demonstration plant based on the company's S-PRISM fast breeder reactor prior to the design receiving full NRC licensing approval.
He has been critical of the NRC's decision-making on the proposed Westinghouse AP1000 reactor design and the NRC response to the Fukushima Daiichi nuclear disaster.
In 1978, the Vermont Yankee reactor was the subject of Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., an important United States Supreme Court administrative law case which ruled that courts cannot impose procedures upon the NRC as this exceeds their power of judicial review.
The NRC stated that the remaining cooling tower had enough capacity to allow the plant to operate at full output, however, until September 16, 2007 the reactor was kept at 50 % power.
The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Vermont Yankee was 1 in 123, 457, according to an NRC study published in August 2010.
The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Shearon Harris was 1 in 434, 783, according to an NRC study published in August 2010.
The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Limerick was 1 in 18, 868, according to an NRC study published in August 2010.
* NRC page, listing new reactor applications.

0.236 seconds.