Help


[permalink] [id link]
+
Page "Dive computer" ¶ 49
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Estimated and air
* Estimated cost for installation is about half that of central refrigerated air conditioning.
* Estimated cost of operation is 1 / 4 that of refrigerated air.

Estimated and time
* Actual Time of Arrival, when a vehicle arrived-see Estimated time of arrival
* Estimated time of task comparing to the real time of the task ( exactitude of planning )
* Estimated time of arrival-eta
da: Estimated time of arrival
de: Estimated time of arrival
nl: Estimated time of arrival
pt: Estimated time of arrival
# Estimated Time Enroute: Planned elapsed time between departure and arrival at the destination.
* Estimated execution time
Estimated quarter mile time in 12. 5 seconds
* Estimated time of arrival ( ETA )

Estimated and based
Estimated flood-crest readings between 1847 and 1979 — based on data from the National Weather Service flood gauge at Lock Haven — show that flooding likely occurred in the city 19 times in 132 years.
* Estimated Average Requirements ( EAR ), expected to satisfy the needs of 50 % of the people in that age group based on a review of the scientific literature.

Estimated and on
Estimated annual savings resulting from publication of the Journal and Bulletin on a triservice basis, as compared with the cost of producing separate periodicals for each service, were between $65,000 and $70,000.
Estimated cluster half lives, after which half the original cluster members will have been lost, range from 150 – 800 million years, depending on the original density.
* Estimated spam Business on UUNET
Estimated as a $ 257 billion market in the United States, the aftermarket helps keep vehicles on the road by providing consumers the choice of where they want their vehicles serviced, maintained or customized.
Estimated levels of protection for the Leopard 2 range from 590-690 RHAe on the turret, 600 RHAe on the glacis and lower front hull on the Leopard 2A4, to 920-940 RHAe on the turret, 620 RHAe on the glacis and lower front hull on the Leopard 2A6 against kinetic projectiles.
Estimated casualties were 6, 506 in total: 1, 710 on the Union side and 4, 796 on the Confederate.
Estimated at in diameter, it is one of the largest impact craters on Earth.
* " Estimated Monthly Installment ", a fixed payment owed each month on a property mortgage or other loan
Estimated total casualties on the Aceh side range from 50, 000 to 60, 000 dead, and over a million wounded.
* Estimated maximum loss, the largest loss expected to arise from a single event on an insured property
Estimated performance on EPA tests show a 5. 5 %- 7. 5 % improvement in fuel economy.
Estimated by the firm at $ 350, 000, the winning contractor bid $ 377, 978, but by the building's dedication on December 28, 1894, it had cost nearly $ 900, 000.
Estimated repairs were on the order of US $ 700, 000, and the Astronauts Memorial Foundation unanimously decided the money would be better spent on educational programs instead.
Estimated costs for this 58 km long project are 800 Million Dirham .. Main reason for expansion is the expected traffic growth, which is calculated at 55-79 % between 2010 and 2020, depending on the stretch of road
The municipal government of Koronadal began its official function on January 1, 1948 with an approved Annual Estimated Budget of P30, 000. 00.

Estimated and gas
Estimated recoverable reserves are 193 billion cubic meters of natural gas, of condensate ( light oil ), and 5. 1 million tonnes of natural gas liquids ( NGL ).
* Estimated climate forcings of natural climatic factors and anthropogenic aerosols ( e. g., sulfate, which is produced when sulfur-rich coal is burnt ), future changes in greenhouse gas ( GHG ) emissions, and the role of climate feedbacks, which may amplify or reduce the magnitude of future climate change ;
* Estimated ultimate recovery, a term used by certain petroleum analysts for the total amount of oil or gas to be produced from a given well or field

Estimated and rate
Estimated performance included sustained speeds of Mach 3 at 95, 000 feet and vertical climb rate above 40, 000 feet of Mach 2. 5.
Estimated rate of diagnosed HIV cases in U. S. 2009 ( per 100, 000 )
Estimated changes in the mass of Greenland's ice sheet suggest it is melting at a rate of about 239 cubic kilometres ( 57. 3 cubic miles ) per year.
Estimated failure rate is
* Estimated glomerular filtration rate ( eGFR )

Estimated and .
Estimated production costs of radiation energy from machine and nuclide sources range from $1 to $10 per Aj.
Estimated GDP per capita in purchasing power parity ( PPP ) in 2010 was around USD 19, 754 or 63. 3 % of the EU average for the same year.
Estimated distribution of dark matter and dark energy in the universe.
Estimated dietary intake has also declined, although FDA food tests commonly detect it.
Estimated production will be 350, 000 ounces of gold per year until the gold runs out, at which point the mine will produce copper and zinc.
" Estimated $ 200 million was lost in these scams.
Estimated foreign-born population by country of birth, 2006 figures.
Estimated cost for new dreadnoughts was placed at 36. 5 million GM for 19, 000 ton displacement ships ( larger than Dreadnought at 17, 900 tons ), and 27. 5 million GM for battlecruisers.
Estimated to be completed within six to eight months, it had first been proposed and then postponed for 43 years previously by the then government.
Estimated ovulation dates from fertility charts are a more accurate method of estimating gestational age than the traditional pregnancy wheel or last menstrual period ( LMP ) method of tracking menstrual periods.
Estimated oil production in Trinidad and Tobago in 2005 was about.
* 14. 1 Tm — 94. 3 AU — Estimated radius of the solar system
* 9. 0 Gm — Estimated diameter of the event horizon of Sagittarius A *, the supermassive black hole in the center of the Milky Way galaxy
* 5. 007 Mm — Estimated length of Interstate 90 ( Seattle, Washington to Boston, Massachusetts )
* 1. 000 Mm — Estimated shortest axis of triaxial dwarf planet
* 1. 960 Mm — Estimated longest axis of Haumea
Estimated ratios of dark matter and dark energy ( which may be the cosmological constant ) in the universe.
* November 10 – Estimated appearance date of Halley's Comet.
Estimated stock size was 2. 26 million tonnes in 2008.

1.747 seconds.