Help


[permalink] [id link]
+
Page "Western Illinois University" ¶ 12
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Completed and November
Completed on November 1, 1991 at a cost of $ 55 million, it was the largest university-owned arena in Ohio until Value City Arena at Ohio State University was completed.
Completed at a cost of $ 17, 203, 000, the Sideling Hill bypass opened on November 26, 1968.
Completed in November 2001.
Completed in November 1990, the new Talmadge Memorial cable-stayed bridge replaced the old Talmadge cantilever truss bridge ( built in 1953 ), which had become a danger for large ships entering the Port of Savannah, home to the largest single ocean container terminal on the U. S. eastern seaboard, and the nation's fourth-busiest seaport.
Completed November 2001
** Trump International Hotel and Tower Waikiki: Completed in November 2009 with 462 hotel-condominium units.

Completed and 1975
Completed in 1975, the building stands on the site of Northern's original campus.
Completed in 1975 at a cost of $ 18 million, The Summit represented a lavish new breed of sports arena, replete with amenities, that would help the NBA grow from a second-tier professional sport into the multi-billion dollar entertainment industry that it is today.
Completed in 1975, it was 100 metres tall and had 25 floors in three wings.
Completed in 1975 as the Pontiac Metropolitan Stadium, at a cost of $ 55. 7 million, the Silverdome seats 80, 311.
Completed in 1975, at a cost of $ 16 million, it seated 16, 061, for hockey games, 17, 171, for basketball games and contained 27 luxury suites, which were installed as part of the 1986 renovation.
Completed in 1975, it is Boston's 11th-tallest building, standing 520 feet ( 159 m ) tall, and housing 38 floors.
Completed in 1975, Columbia Pictures picked up the distribution rights but demanded that minor changes be made to reduce potentially controversial aspects of the plot.
The Incomplete Enchanter and The Castle of Iron have also been issued together as The Compleat Enchanter ( 1975 ); Wall of Serpents has also been issued under the title The Enchanter Completed ( 1980 ); all three volumes of the original series have also been issued together as The Complete Compleat Enchanter ( 1989 ).

Completed and Memorial
Completed in 1913, the Jefferson Memorial building was built near the main entrance to the Exposition, at Lindell and DeBalivere.
Completed in 1924 on the south shore of Sunday Lake, the Wakefield Memorial Building was the center of the community.
Completed after Barry's death in 1863 was the classical, Guest Memorial Reading Room and Library in Dowlais, Wales.
Completed in October 2010, the Mike O ' Callaghan – Pat Tillman Memorial Bridge spans the Colorado River between Nevada and Arizona.
Completed in 1933, the George Rogers Clark Memorial, built in Roman Classical style, stands on what was then believed to be the site of Fort Sackville, and is now the George Rogers Clark National Historical Park.

Completed and Library
Completed in August 1996, the remodeled space made it possible for the library to quadruple the number of books held at the Athens Branch Library and to offer a wider range of programs to children.
Completed in 1998, the William T. Young Library serves both the university campus and the Commonwealth of Kentucky
) Completed by late 1940, the Central Library opened to the public on February 1, 1941.
Completed the spring of 1992, the Gordon B. Olson Library presently serves an enrollment of more than 3, 000 students.
Completed in 1992, Richardson Library faces the Quad in the heart of DePaul University's Lincoln Park Campus.
Completed in 1899, the Parliamentary Library is the oldest of the buildings.

Completed and F
Completed in 1999, the Business Classroom Project was a US $ 16 million renovation of the James F. Boccardo Business Education Center.

Completed and .
Completed and opened for traffic in 1852, the bridge was designed and built by Lemuel Chenoweth and his brother, Eli, of Beverly.
Completed probably early in his life, before the Arian controversy, they constitute the first classic work of developed Orthodox theology.
Completed 22 March 1996.
Completed in 1824, the symphony is one of the best-known works of the Western classical repertoire.
Completed in about 731 ,, Bede was aided in writing this book by Albinus, abbot of St Augustine's Abbey, Canterbury.
Completed by P. Schuyler Miller and John D. Clark, the chronology was later revised by Clark and L. Sprague de Camp in An Informal Biography of Conan the Cimmerian ( 1952 ).
Completed in 380, the treasury draws inspiration mostly from the Temple of Hera located in the Argolis, the acropolis of the city.
Completed projects include the Convention Centre, The O < sub > 2 </ sub >, and the Grand Canal Theatre.
Completed in 1815, it was the first national-scale geologic map, and by far the most accurate of its time.
* Liberty Square – Upperclassmen – Completed 2003, and housing approximately 500 students in two and four person apartments.
* Potomac Heights – Upperclassmen – Completed 2004, and housing approximately 500 students in apartments which can accommodate two, four or six students in single and double bedrooms.
* Chesapeake – Upperclassmen – Completed 2004, and housing approximately 800 students among its 4 halls ( Blue Ridge, Sandbridge ( formerly named Shenandoah ), Piedmont, Tidewater ) in suite-style apartments for four people which vary in combining single and double bedrooms, all which share a common bathroom.
* Dominion – Upperclassmen – Completed in 1981, and housing approximately 500 students in suite-style double occupancy rooms, which share bathrooms with the adjacent suite.
* Eastern Shore – Freshmen Honors College Students – Completed in 2009, and housing approximately 200 students in suite-style rooms holding up to four residents sharing a single bathroom.
* Commonwealth – Upperclassman – Completed in 1981, and housing approximately 500 students in suite-style double occupancy rooms, which share bathrooms with the adjacent suite.
* Hampton Roads – All Students – Completed in 2010 and housing approximately 400 students.
* Northern Neck – Upperclassman – Completed in 2008 and housing approximately 400 students.
* Student Apartments – Upperclassman – Completed in 1977 and housing approximately 500 students, in bedroom apartments, each bedroom accommodating two students and each suite sharing one bathroom.
Completed in 2002, it is the newest educational building on campus.
Completed and reopened in March 2007, Morrill Hall is home to the Christian Petersen Art Museum.
Completed by a third volume, the Traité de la Divinité de Nôtre Seigneur Jésus-Christ, it appeared at Rotterdam, 1689.
Image: Motion Animated. gif |< center > Completed Animation </ center >
Image: Shape NoHint. gif |< center > Completed Animation </ center >

0.510 seconds.