[permalink] [id link]
Completed in November 2001.
from
Wikipedia
Some Related Sentences
Completed and November
Completed in November 1975, Memorial Library ( renamed and rededicated The Leslie F. Malpass Library in 2001 ) is the main branch of the library system.
Completed on November 1, 1991 at a cost of $ 55 million, it was the largest university-owned arena in Ohio until Value City Arena at Ohio State University was completed.
Completed in November 1990, the new Talmadge Memorial cable-stayed bridge replaced the old Talmadge cantilever truss bridge ( built in 1953 ), which had become a danger for large ships entering the Port of Savannah, home to the largest single ocean container terminal on the U. S. eastern seaboard, and the nation's fourth-busiest seaport.
** Trump International Hotel and Tower Waikiki: Completed in November 2009 with 462 hotel-condominium units.
Completed and 2001
Completed in 2001, the shapes and stonework of the Center of Southwest Studies complex reflect the ancestral puebloan structures found throughout the Four Corners.
Completed in June 2000 it was transported to specially built facilities in California and officially dedicated on August 15, 2001.
Completed for the 2001 season under the patronage of Arthur and Jane Stieren, the hall fulfills the long-standing need for an orchestra rehearsal hall.
Completed in the fall of 2001, this modern $ 3. 6 million facility encompasses approximately of new construction and of renovated space which is linked to the former Spiritwood Hospital and Idylwild Lodge to serve as one integrated facility.
Completed KPF projects in Asia include Plaza 66 on Shanghai ’ s Nanjing Xi Lu ( 2001 ), Roppongi Hills in Tokyo ( 2003 ), the Rodin Pavilion in Seoul ( 2003 ), the Merrill Lynch Japan Head Office in Tokyo ( 2004 ) and the Shanghai World Financial Center ( 2008 ), which was named the “ Best Tall Building Overall ” by the Council on Tall Buildings and the Urban Habitat in 2008.
Completed in 1910 to replace an older station on the same site, the station was Kuala Lumpur's railway hub in the city for the Federated Malay States Railways and Malayan Railway ( Malay: Keretapi Tanah Melayu ), before Kuala Lumpur Sentral assumed much of its role in 2001.
Completed in June 2001, the clubhouse also has its own parking bays for its fleet of Piper Warrior II, CT-4E and Diamond DA-40.
Completed and .
Completed and opened for traffic in 1852, the bridge was designed and built by Lemuel Chenoweth and his brother, Eli, of Beverly.
Completed probably early in his life, before the Arian controversy, they constitute the first classic work of developed Orthodox theology.
Completed in about 731 ,, Bede was aided in writing this book by Albinus, abbot of St Augustine's Abbey, Canterbury.
Completed by P. Schuyler Miller and John D. Clark, the chronology was later revised by Clark and L. Sprague de Camp in An Informal Biography of Conan the Cimmerian ( 1952 ).
Completed in 380, the treasury draws inspiration mostly from the Temple of Hera located in the Argolis, the acropolis of the city.
Completed projects include the Convention Centre, The O < sub > 2 </ sub >, and the Grand Canal Theatre.
Completed in 1815, it was the first national-scale geologic map, and by far the most accurate of its time.
* Liberty Square – Upperclassmen – Completed 2003, and housing approximately 500 students in two and four person apartments.
* Potomac Heights – Upperclassmen – Completed 2004, and housing approximately 500 students in apartments which can accommodate two, four or six students in single and double bedrooms.
* Chesapeake – Upperclassmen – Completed 2004, and housing approximately 800 students among its 4 halls ( Blue Ridge, Sandbridge ( formerly named Shenandoah ), Piedmont, Tidewater ) in suite-style apartments for four people which vary in combining single and double bedrooms, all which share a common bathroom.
* Dominion – Upperclassmen – Completed in 1981, and housing approximately 500 students in suite-style double occupancy rooms, which share bathrooms with the adjacent suite.
* Eastern Shore – Freshmen Honors College Students – Completed in 2009, and housing approximately 200 students in suite-style rooms holding up to four residents sharing a single bathroom.
* Commonwealth – Upperclassman – Completed in 1981, and housing approximately 500 students in suite-style double occupancy rooms, which share bathrooms with the adjacent suite.
* Student Apartments – Upperclassman – Completed in 1977 and housing approximately 500 students, in bedroom apartments, each bedroom accommodating two students and each suite sharing one bathroom.
Completed by a third volume, the Traité de la Divinité de Nôtre Seigneur Jésus-Christ, it appeared at Rotterdam, 1689.
0.140 seconds.