Help


[permalink] [id link]
+
Page "Expo Line (TransLink)" ¶ 20
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Construction and 4
Construction and installation formed 10. 4 % of the GDP in 1999.
Construction of a 4, 200-km-long pipeline from Xinjiang to Shanghai ( West – East Gas Pipeline ) was completed in 2004.
Construction began on Enterprise on June 4, 1974.
Construction began in 1914 under the leadership of Charles Sumner Frost and took two years, at a total cost of $ 4. 5 million.
Construction began on 21 September 2004, and the building officially opened on 4 January 2010.
* Construction ( 4. 43 %)
According to Bureau of Labor Statistics data from October 2008, the largest sectors of non-agricultural employment were: Government, 24. 3 %; Trade, Transportation, and Utilities, 17. 3 % ( including 11. 0 % in retail trade ); Professional and Business Services, 11. 9 %; Manufacturing, 10. 9 %; Education and Health Services, 10. 0 % ( including 8. 5 % in Health Care & Social Assistance ); Leisure and Hospitality, 9. 2 %; Financial Activities, 6. 0 %, Natural Resources, Mining and Construction, 5. 1 %; Information, 1. 4 %; and Other services 4. 0 %.
* 4 World Trade Center – Construction began in 2008.
: * Construction 4, 504 employees
* Construction of the bridge was featured in the Channel 4 television series The Worst Jobs in History, as part of an episode entitled The Worst Industrial Jobs in History, first broadcast on 7 May 2006.
Construction of the new 22 million dollar Seacoast Inn, a 78-room, four-story, upscale Mediterranean-style resort with restaurant, spa and conference facilities, is underway on the 1. 4 acre oceanfront lot and due to be complete by October 2012.
Construction got underway on 28 July 1941 for a twin-engine advanced training base with accommodations for 4, 100 men.
Construction of the purpose-built campus began in 1964, with the first building, now known as 4 South, completed in 1965, and the Royal Charter was granted in 1966.
Construction of Terminal 3 began in 2004 as next stage of phase 2 of the development, with an estimated cost of around $ 4. 55 billion.
The stretch between Junctions 7 and 8 opened in 1975, and that between Junctions 4 and 7 ( constructed to the south of the future M25 interchange by W & C French Engineering, and to the north of the future M25 interchange by Dowsett Engineering Construction Ltd of Harrogate, Yorkshire ) in 1977.
There are also specialist technical subjects through 4 term graduate certificate courses ( in Theatre Design, Theatre Costume, Scenic Art ( this course runs in partnership with the apprenticeship schemes of the Royal Opera House and The Royal National Theatre ), Scenic Construction, Property Making and Stage Electrics and Lighting Design ) and offers a Master ( MA ) in Text and Performance Studies taught jointly between RADA and Birkbeck College, University of London.
* 5 Area Construction Troop, 4 Engineer Support Regiment-Courcelette
* 2 Area Construction Troop, 4 Engineer Support Regiment-Petawawa
* 1 Area Construction Troop, 4 Engineer Support Regiment-( CFB Edmonton )
Construction of the first blast furnace began on July 1, 1861, and it went into operation on January 4, 1863.
Construction began on July 4, 1828, when Charles Carroll of Carrollton did the groundbreaking.
* July 4, 1817: Construction on the Erie Canal began
Construction typically takes 4 to 5 days and may continue through incubation.
Construction costs are estimated at 4. 2 billion euros.

Construction and km
Conversely, in 2004 the South Korean government charged the Korean High Speed Rail Construction Authority, a public entity, to construct its high speed rail line, 412 km from Seoul to Busan, in two phases.
Construction on a replacement airport 45 km inland from Léopold Sédar Senghor has begun.
Construction started in 1790, and the 25 miles ( 40 km ) of canal was fully opened by 1794.
Construction of a new port at Shearwater Bay, 30 km south of Lüderitz, has been proposed for the export of coal from Botswana with a 1600 km railway connecting the two.
Construction of the first 45. 7 km segment between Takeo-Onsen and Isahaya began on 28 April 2008.
Construction of the parkway began in 1924 and the first two-mile ( 3 km ) section was completed in December 1927.
* 1901 Construction of the 8, 000 foot ( 2. 4 km ) long outer stone breakwater barrier completed.
Construction began in 1987, with Columbia Station opening on February 14, 1989, adding the first 0. 6 km of guideway in the City of New Westminster.
Construction of parts of the 162. 1 km section to Toyama began as early as 1993, and, construction is currently underway as far as Kanazawa.
Construction of a second tailrace tunnel in the late 1990's, 10 km long and 10 metres in diameter, finally solved the problem.
The Sagami Railway and the Japan Railway Construction, Transport and Technology Agency are jointly planning a 2. 7 km new line, called the, connecting Nishiya Station on the Sōtetsu Line with the Tōkaidō Freight Line.
Construction began in October 2001, with 66 shield tunnels ( 45. 3 km ) completed in May 2006.
Construction started in 2001 and a 3 km section linking the Pan Island Expressway and East Coast Parkway was opened in late 2007.
Construction of the dam resulted in flooding of the lower reaches of the Chusovaya up to 125 km from the mouth.
Construction on the 20 km long adhesion railway Santos-Piassagüera began on March 15, 1860 and on the incline system in the year 1861.
Construction of the present-day Presidential Palace in Warsaw was begun in 1643 by Crown Field Hetman Stanisław Koniecpolski, owner of the town of Brody ( 80 km.
Construction of the expressway also included the Adelaide Southern Veloway for cyclists, which runs alongside it for 7 km, from Marion / Main South Road to the Panalatinga Tunnel.
Construction began on the railway line from Baranovski Station to a point 190 km away in the direction opposite of Kraskino, and was completed in 1941.
According to the National Expressway Construction Association, 4. 41 million vehicles use the expressways daily, driving an average of 43. 7 km.
Construction began on April 19, 1851 from Albany to Schoharie Junction, New York, a distance of 35 miles ( 56 km ).
Construction on Byron Nuclear Generating Station began in 1975, at a 1, 782-acre ( 7. 2 km² ) site, 17 miles ( 27 km ) southwest of Rockford, Illinois, south of the city of Byron in Ogle County.
Construction then proceeded up the Leader River valley as part of a somewhat inland route to Kaikoura via river valleys, but the start of World War I brought a halt to construction and the 3 km of track laid beyond Parnassus was removed.
Construction of the dam resulted in the formation of Little Rock Lake approximately five miles ( 8 km ) upriver.

0.731 seconds.