[permalink] [id link]
Construction of a 4 km second extension, or Phase III, began in late 1991 and opened on March 24, 1994, introducing three stations into the Whalley area of the City of Surrey.
from
Wikipedia
Some Related Sentences
Construction and 4
Construction of a 4, 200-km-long pipeline from Xinjiang to Shanghai ( West – East Gas Pipeline ) was completed in 2004.
Construction began in 1914 under the leadership of Charles Sumner Frost and took two years, at a total cost of $ 4. 5 million.
According to Bureau of Labor Statistics data from October 2008, the largest sectors of non-agricultural employment were: Government, 24. 3 %; Trade, Transportation, and Utilities, 17. 3 % ( including 11. 0 % in retail trade ); Professional and Business Services, 11. 9 %; Manufacturing, 10. 9 %; Education and Health Services, 10. 0 % ( including 8. 5 % in Health Care & Social Assistance ); Leisure and Hospitality, 9. 2 %; Financial Activities, 6. 0 %, Natural Resources, Mining and Construction, 5. 1 %; Information, 1. 4 %; and Other services 4. 0 %.
* Construction of the bridge was featured in the Channel 4 television series The Worst Jobs in History, as part of an episode entitled The Worst Industrial Jobs in History, first broadcast on 7 May 2006.
Construction of the new 22 million dollar Seacoast Inn, a 78-room, four-story, upscale Mediterranean-style resort with restaurant, spa and conference facilities, is underway on the 1. 4 acre oceanfront lot and due to be complete by October 2012.
Construction got underway on 28 July 1941 for a twin-engine advanced training base with accommodations for 4, 100 men.
Construction of the purpose-built campus began in 1964, with the first building, now known as 4 South, completed in 1965, and the Royal Charter was granted in 1966.
Construction of Terminal 3 began in 2004 as next stage of phase 2 of the development, with an estimated cost of around $ 4. 55 billion.
The stretch between Junctions 7 and 8 opened in 1975, and that between Junctions 4 and 7 ( constructed to the south of the future M25 interchange by W & C French Engineering, and to the north of the future M25 interchange by Dowsett Engineering Construction Ltd of Harrogate, Yorkshire ) in 1977.
There are also specialist technical subjects through 4 term graduate certificate courses ( in Theatre Design, Theatre Costume, Scenic Art ( this course runs in partnership with the apprenticeship schemes of the Royal Opera House and The Royal National Theatre ), Scenic Construction, Property Making and Stage Electrics and Lighting Design ) and offers a Master ( MA ) in Text and Performance Studies taught jointly between RADA and Birkbeck College, University of London.
Construction of the first blast furnace began on July 1, 1861, and it went into operation on January 4, 1863.
Construction and km
Conversely, in 2004 the South Korean government charged the Korean High Speed Rail Construction Authority, a public entity, to construct its high speed rail line, 412 km from Seoul to Busan, in two phases.
Construction of a new port at Shearwater Bay, 30 km south of Lüderitz, has been proposed for the export of coal from Botswana with a 1600 km railway connecting the two.
Construction of the parkway began in 1924 and the first two-mile ( 3 km ) section was completed in December 1927.
Construction began in 1987, with Columbia Station opening on February 14, 1989, adding the first 0. 6 km of guideway in the City of New Westminster.
Construction of parts of the 162. 1 km section to Toyama began as early as 1993, and, construction is currently underway as far as Kanazawa.
Construction of a second tailrace tunnel in the late 1990's, 10 km long and 10 metres in diameter, finally solved the problem.
The Sagami Railway and the Japan Railway Construction, Transport and Technology Agency are jointly planning a 2. 7 km new line, called the, connecting Nishiya Station on the Sōtetsu Line with the Tōkaidō Freight Line.
Construction started in 2001 and a 3 km section linking the Pan Island Expressway and East Coast Parkway was opened in late 2007.
Construction of the dam resulted in flooding of the lower reaches of the Chusovaya up to 125 km from the mouth.
Construction on the 20 km long adhesion railway Santos-Piassagüera began on March 15, 1860 and on the incline system in the year 1861.
Construction of the present-day Presidential Palace in Warsaw was begun in 1643 by Crown Field Hetman Stanisław Koniecpolski, owner of the town of Brody ( 80 km.
Construction of the expressway also included the Adelaide Southern Veloway for cyclists, which runs alongside it for 7 km, from Marion / Main South Road to the Panalatinga Tunnel.
Construction began on the railway line from Baranovski Station to a point 190 km away in the direction opposite of Kraskino, and was completed in 1941.
According to the National Expressway Construction Association, 4. 41 million vehicles use the expressways daily, driving an average of 43. 7 km.
Construction began on April 19, 1851 from Albany to Schoharie Junction, New York, a distance of 35 miles ( 56 km ).
Construction on Byron Nuclear Generating Station began in 1975, at a 1, 782-acre ( 7. 2 km² ) site, 17 miles ( 27 km ) southwest of Rockford, Illinois, south of the city of Byron in Ogle County.
Construction then proceeded up the Leader River valley as part of a somewhat inland route to Kaikoura via river valleys, but the start of World War I brought a halt to construction and the 3 km of track laid beyond Parnassus was removed.
Construction of the dam resulted in the formation of Little Rock Lake approximately five miles ( 8 km ) upriver.
0.731 seconds.