Help


[permalink] [id link]
+
Page "International School of Curitiba" ¶ 6
from Wikipedia
Edit
Promote Demote Fragment Fix

Some Related Sentences

Completed and 2001
Completed in 2001, the shapes and stonework of the Center of Southwest Studies complex reflect the ancestral puebloan structures found throughout the Four Corners.
Completed in June 2000 it was transported to specially built facilities in California and officially dedicated on August 15, 2001.
** Completed 2001.
Completed in November 1975, Memorial Library ( renamed and rededicated The Leslie F. Malpass Library in 2001 ) is the main branch of the library system.
Completed for the 2001 season under the patronage of Arthur and Jane Stieren, the hall fulfills the long-standing need for an orchestra rehearsal hall.
Completed in the fall of 2001, this modern $ 3. 6 million facility encompasses approximately of new construction and of renovated space which is linked to the former Spiritwood Hospital and Idylwild Lodge to serve as one integrated facility.
Completed KPF projects in Asia include Plaza 66 on Shanghai ’ s Nanjing Xi Lu ( 2001 ), Roppongi Hills in Tokyo ( 2003 ), the Rodin Pavilion in Seoul ( 2003 ), the Merrill Lynch Japan Head Office in Tokyo ( 2004 ) and the Shanghai World Financial Center ( 2008 ), which was named the “ Best Tall Building Overall ” by the Council on Tall Buildings and the Urban Habitat in 2008.
Completed in November 2001.
Completed in 1910 to replace an older station on the same site, the station was Kuala Lumpur's railway hub in the city for the Federated Malay States Railways and Malayan Railway ( Malay: Keretapi Tanah Melayu ), before Kuala Lumpur Sentral assumed much of its role in 2001.
* Completed: March 2001
Completed in June 2001, the clubhouse also has its own parking bays for its fleet of Piper Warrior II, CT-4E and Diamond DA-40.
Completed in 2001, the bridge was designed by Grimshaw Architects.
Completed November 2001
Completed in 1964, the home was moved from Wilsonville, Oregon, to the garden in 2001.

Completed and Santa
Completed in 1949 and fully opened in 1953 at the northern edge of Downtown Los Angeles, California, USA, it connects U. S. Route 101 ( Hollywood Freeway and Santa Ana Freeway ) to State Route 110 ( Harbor Freeway and Arroyo Seco Parkway ).

Completed and campus
Completed in 2002, it is the newest educational building on campus.
Completed in 1975, the building stands on the site of Northern's original campus.
Completed in 1994, the campus of CSI / CUNY is the largest site for a college in New York City.
Completed in 1998, the William T. Young Library serves both the university campus and the Commonwealth of Kentucky
Completed in 1917, it is the oldest building on campus and was home to Sarah Bates Lawrence and William Van Duzer Lawrence before being given to the College.
Completed in January 2010, the transition marks the end of a two-year, $ 52 million construction project which included the addition of the elegant, new Lewis Katz Hall which is completely interconnected with the University Park campus via the most advanced high-definition, digital audiovisual telecommunications system available.
Classes began in the fall of 1820 in Old Centre, the first building on campus and the oldest college administration building west of the Allegheny Mountains. Completed in 1820, Old Centre is the oldest continuously operated academic building west of the Alleghenies.
Completed in 1820, Old Centre is the College's first building, the oldest continuously operated academic building west of the Alleghenies, and the template for the Greek Revival style of the campus.
* Completed a $ 120-million campus enhancement and facilities expansion funded by the community through the 1999 Measure E Bond Initiative.
* Completed in 1841 to accommodate growth in student enrollment and known affectionately as “ Old College ,” this was the first building built on Tusculum ’ s campus.
Completed in September 1970 at the north end of the ISU campus, Holt Arena is the oldest enclosed stadium on a college campus in the United States and the second-oldest overall.
Completed in 1910 and designed by Harvard architect H. Langford Warren, Flowers Hall was designed to emulate the collegiate Gothic architecture of Oxford and Cambridge, England, and of Cambridge, Massachusetts, and set the tone for the pervasive architectural style of campus buildings henceforth.
Completed in 2006, the new campus is able to cater 13, 000 students.
Completed in the summer of 2009, it is one of the newest buildings on campus.
Completed in 2009, the Ashdown campus renovation has introduced a Culinary Arts kitchen as well as the Barbara Horn Civic Center.
Completed in 1900, as part of the original New York University campus at the site, the building was donated by Helen Gould and was formally dedicated on May 30, 1901.

Completed and 1
* Presidents Park – Freshmen – Completed in 1989, and housing approximately 1, 100 students in twelve halls ( Adams, Kennedy, Roosevelt, Harrison, Lincoln, Truman, Jackson, Madison, Wilson, Jefferson, Monroe, Washington ).
* 2004Ministerial Conference in Paris announces 212 new projects ( budget € 518 million ) and six new Clusters • Completed project total reaches 1, 800 with a total value of € 18. 0bn
Completed in 1963, it covers an area of 1. 01 km² and has a capacity of 24. 5 x 10 < sup > 6 </ sup > m < sup > 3 </ sup >.
Completed on July 1, 2004, the $ 1. 3 billion acquisition gave Boyd Gaming four additional Las Vegas properties — Suncoast, Gold Coast, the Orleans and Barbary Coast.
Completed in June 2008, the new configuration of the airport now enables it to handle 1. 4 million passengers a year.
Completed in 2002, the building hosts 20 classrooms, six conference rooms, DLSU's administrative offices and the Teresa G. Yuchengco Auditorium, a three-storey 1, 100-seater auditorium.
) Completed by late 1940, the Central Library opened to the public on February 1, 1941.
Completed in 1999, the US $ 1. 5 million Heritage Gateway project was unveiled.
Completed in 1965 as an office block at a cost of £ 1 million during the post-war rebuilding of the Bull Ring, it was initially much derided and considered a " dead building ".
Completed in 1973 under the terms of the 1964 Columbia River Treaty, the Mica powerhouse has a generating capacity of 1, 805 megawatts ( MW ).
Completed on November 1, 1991 at a cost of $ 55 million, it was the largest university-owned arena in Ohio until Value City Arena at Ohio State University was completed.
# 8 to 1 Completed
Completed in October 1997 at a cost of $ 2. 9 million, the " horizontal elevator " was designed to carry 1, 000 commuters a day at speeds up to taking about 55 seconds to travel end to end.
Completed in 1967, this 52-story, 688 ft ( 209. 7 m ) highrise provides 1. 2 million square feet ( 110, 000 m² ) of office space in lower Manhattan and is noted for Isamu Noguchi's distinctive Cube sculpture at its entrance.
Completed on January 1, 1998.
** Completed event in overall 1st Place ( Time 1: 57: 44. 8 )
* 1 King West ( Completed )
Completed in 1998, this repair work cost 1. 3 million US dollars.
Completed in 2000, it is 356m ( 1, 168ft ) high ( spire / antenna height ).
Completed in 1881, it was owned by Pillsbury and operated two of the most powerful direct-drive waterwheels ever built, each generating 1, 200 horsepower ( 895 kW ).
Completed three years later with a cost in 1929 dollars of $ 1. 2 million, the mammoth building instantly dominated the city skyline and was the first skyscraper built outside a major metropolitan area.
Completed in 1973, the Farm, as it is known locally, consists of 1, 000 flats ( apartments ) in 12 blocks surrounded by high-level outdoor walkways.

0.253 seconds.